{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,16]],"date-time":"2026-04-16T16:37:43Z","timestamp":1776357463746,"version":"3.51.2"},"reference-count":12,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,11]]},"DOI":"10.1109\/iccsce.2015.7482204","type":"proceedings-article","created":{"date-parts":[[2016,6,2]],"date-time":"2016-06-02T17:07:28Z","timestamp":1464887248000},"page":"315-319","source":"Crossref","is-referenced-by-count":3,"title":["Cascade hydroelectric scheme: River flow estimation for reservoir regulation improvement and flood-risk mitigation"],"prefix":"10.1109","author":[{"given":"Razali","family":"Jidin","sequence":"first","affiliation":[]},{"given":"Abdul Bahari","family":"Othman","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9496(2004)130:2(93)"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1029\/WR021i012p01797"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9496(1993)119:1(1)"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/S0022-1694(01)00353-5","article-title":"Quantitative flood forecasting using multisensory neural networks","volume":"246","author":"kim","year":"2001","journal-title":"Journal of Hydrology"},{"key":"ref11","first-page":"87","article-title":"Modeling hydropower plant system to improve its reservoir operation","volume":"2","author":"bosona","year":"2010","journal-title":"Journal of Water Resources and Environmental Engineering"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.3390\/en3030462"},{"key":"ref12","article-title":"Reservoir Operation Analysis Aimed to Optimize the Capacity Factor of Hydroelectric Power Generation","volume":"12","author":"tilahun derib","year":"0"},{"key":"ref8","first-page":"286","article-title":"New expert system for short, medium and long-term flood forecasting warning","volume":"78","author":"el mabrouk","year":"2015","journal-title":"Journal of Theoritical and Applied Information Technology"},{"key":"ref7","first-page":"203","article-title":"Forecasting for flood warning, ELSEVIER, External Geophysics","volume":"337","author":"moore","year":"2005","journal-title":"Climate and Environment"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1061\/40976(316)548"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4471-2291-3"},{"key":"ref1","article-title":"Optimization of Multiple-Purpose Reservoir System Operations: A Review of Modeling and Analysis Approaches","author":"wurba","year":"1991","journal-title":"Hydrologic Engineering Center US Army Corps of Engineers"}],"event":{"name":"2015 IEEE International Conference on Control System, Computing and Engineering (ICCSCE)","location":"Penang, Malaysia","start":{"date-parts":[[2015,11,27]]},"end":{"date-parts":[[2015,11,29]]}},"container-title":["2015 IEEE International Conference on Control System, Computing and Engineering (ICCSCE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7468595\/7482142\/07482204.pdf?arnumber=7482204","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,24]],"date-time":"2017-06-24T15:36:26Z","timestamp":1498318586000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7482204\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,11]]},"references-count":12,"URL":"https:\/\/doi.org\/10.1109\/iccsce.2015.7482204","relation":{},"subject":[],"published":{"date-parts":[[2015,11]]}}}