{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,18]],"date-time":"2026-03-18T09:59:55Z","timestamp":1773827995376,"version":"3.50.1"},"reference-count":18,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,11,9]],"date-time":"2023-11-09T00:00:00Z","timestamp":1699488000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,11,9]],"date-time":"2023-11-09T00:00:00Z","timestamp":1699488000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,11,9]]},"DOI":"10.1109\/icdl55364.2023.10364524","type":"proceedings-article","created":{"date-parts":[[2023,12,25]],"date-time":"2023-12-25T19:40:19Z","timestamp":1703533219000},"page":"449-454","source":"Crossref","is-referenced-by-count":1,"title":["Safety Analysis and Prediction for Transmission Tower Construction"],"prefix":"10.1109","author":[{"given":"Wenkai","family":"Gong","sequence":"first","affiliation":[{"name":"State Grid Jiangxi Electric Power Co., Ltd.,Nanchang,China,330000"}]},{"given":"Qi","family":"Wei","sequence":"additional","affiliation":[{"name":"School of Information Engineering, Nanchang University,Nanchang,China,330031"}]},{"given":"Yuan","family":"Liu","sequence":"additional","affiliation":[{"name":"State Grid Jiangxi Electric Power Co., Ltd.,Nanchang,China,330000"}]},{"given":"Yunfei","family":"Zeng","sequence":"additional","affiliation":[{"name":"School of Advanced Manufacturing, Nanchang University,Nanchanz,China,330031"}]},{"given":"Zhenyu","family":"Jiang","sequence":"additional","affiliation":[{"name":"School of Future Technology, Nanchang University,Nanchang,China,330031"}]},{"given":"Zhichi","family":"Lin","sequence":"additional","affiliation":[{"name":"State Grid Jiangxi Electric Power Co., Ltd.,Nanchang,China,330000"}]},{"given":"Fan","family":"Gan","sequence":"additional","affiliation":[{"name":"State Grid Jiangxi Electric Power Co., Ltd.,Nanchang,China,330000"}]}],"member":"263","reference":[{"issue":"4","key":"ref1","first-page":"88","article-title":"Design and Application of Load Bearing Detection System for Suspension Holding Pole Tower Assembly Process","volume":"42","author":"Zeng","year":"2023","journal-title":"Measurement & Control Technology"},{"issue":"8","key":"ref2","first-page":"11","article-title":"Electro-mechanical Impedance Wireless Smart Sensor for Structural Health Monitoring","volume":"4","author":"Liu","year":"2013","journal-title":"Instrument Technique and Sensor"},{"issue":"S1","key":"ref3","first-page":"1","article-title":"Research of Bridge Intelligent Inspection Technology and Application","volume":"49","author":"Zhong","year":"2019","journal-title":"Bridge Construction"},{"issue":"18","key":"ref4","first-page":"150","article-title":"The bolt intelligent assembly system based on machine vision research","volume":"36","author":"Ge","year":"2014","journal-title":"Manufacturing Automation"},{"issue":"10","key":"ref5","first-page":"94","article-title":"Unmanned Aerial Vehicle (UAV) is Loose Monitoring Method Based on Image Monitoring Research","volume":"32","author":"Cai","year":"2015","journal-title":"Computer Simulation"},{"issue":"4","key":"ref6","first-page":"42","article-title":"Research on Multi-sensor Integrated Monitoring System and Its Application in Large-Scale High-Span Construction","volume":"44","author":"Qiu","year":"2019","journal-title":"Journal of Geomatics"},{"issue":"8","key":"ref7","first-page":"234","article-title":"Research on Integrated System of Intelligent Construction Control and Health Monitoring","author":"Cao","year":"2016","journal-title":"Urban Roads Bridges & Flood Control"},{"issue":"7","key":"ref8","first-page":"131","article-title":"Application of Wireless Measurement and Control Safety Alarm System in the Construction of Extra-High Voltage Tower Establishment","volume":"27","author":"Zhang","year":"2022","journal-title":"Telecom World"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1038\/s41598-022-21395-x"},{"issue":"4","key":"ref10","first-page":"119","volume":"49","author":"Zhang","year":"2023","journal-title":"\u201cDevelopment of a force monitoring sensor for the internal suspension pole tower assembly rope. \u201c China Measurement & Test"},{"issue":"7","key":"ref11","first-page":"206","article-title":"Design of Wireless Intelligent Monitoring System for Levitating Braced Transmission Tower","author":"Huang","year":"2022","journal-title":"Machinery Design & Manufacture"},{"issue":"6","key":"ref12","first-page":"23","article-title":"Study on Overturning Force Analysis of Suspended Pole in Overhead Transmission Line","author":"Meng","year":"2022","journal-title":"Shanxi Electric Power"},{"issue":"5","key":"ref13","first-page":"80","article-title":"Uprising Dynamic Load Coefficient of Suspension Derricks for Transmission Lines","volume":"42","author":"Ma","year":"2022","journal-title":"Noise and Vibration Control"},{"issue":"7","key":"ref14","first-page":"140","article-title":"Force Analysis of Tower Erection with Inner Suspension Holder in 500kV Transmission Line","author":"Fan","year":"2020","journal-title":"Electric Engineering"},{"issue":"5","key":"ref15","first-page":"19","article-title":"Adaptive Weighted Data Fusion Algorithm Based on Batch Estimation","volume":"35","author":"Shi","year":"2022","journal-title":"Electronic Science and Technology"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/CCDC.2017.7978191"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1007\/s11277-022-09900-x"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/ICAIIS49377.2020.9194815"}],"event":{"name":"2023 IEEE International Conference on Development and Learning (ICDL)","location":"Macau, China","start":{"date-parts":[[2023,11,9]]},"end":{"date-parts":[[2023,11,11]]}},"container-title":["2023 IEEE International Conference on Development and Learning (ICDL)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10364334\/10364349\/10364524.pdf?arnumber=10364524","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,1,12]],"date-time":"2024-01-12T21:27:32Z","timestamp":1705094852000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10364524\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,11,9]]},"references-count":18,"URL":"https:\/\/doi.org\/10.1109\/icdl55364.2023.10364524","relation":{},"subject":[],"published":{"date-parts":[[2023,11,9]]}}}