{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T19:01:53Z","timestamp":1754161313188,"version":"3.41.2"},"reference-count":13,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,7,1]],"date-time":"2019-07-01T00:00:00Z","timestamp":1561939200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,7,1]],"date-time":"2019-07-01T00:00:00Z","timestamp":1561939200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,7]]},"DOI":"10.1109\/iceei47359.2019.8988889","type":"proceedings-article","created":{"date-parts":[[2020,2,10]],"date-time":"2020-02-10T22:56:26Z","timestamp":1581375386000},"page":"608-613","source":"Crossref","is-referenced-by-count":4,"title":["Designing Green Procurement System Based On Enterprise Resources Planning For The Rubber Processing Industry"],"prefix":"10.1109","author":[{"given":"Octa","family":"Karlina","sequence":"first","affiliation":[{"name":"School Of Industrial Engineering, Telkom University,Bandung,Indonesia"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ari Yanuar","family":"Ridwan","sequence":"additional","affiliation":[{"name":"School Of Industrial Engineering, Telkom University,Bandung,Indonesia"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Asti Amalia Nur","family":"Fajrillah","sequence":"additional","affiliation":[{"name":"School Of Industrial Engineering, Telkom University,Bandung,Indonesia"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1111\/j.1468-2370.2007.00202.x"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2014.03.002"},{"key":"ref12","first-page":"6912","volume":"5","author":"kuswandi","year":"2018","journal-title":"Perancangan Sistem Monitoring Reverse Logistic Untuk Industri Penyamakan Kulit Dengan Model SCOR"},{"key":"ref13","first-page":"5289","volume":"2","author":"ramadhan","year":"2015","journal-title":"Penerapan Sistem Purchase Management Menggunakan Openerp Dengan Metode Rapid Application Development (Studi Kasus PT Genta Trikarya)"},{"key":"ref4","first-page":"5758","volume":"2","author":"haratawan","year":"2015","journal-title":"Perancangan Sistem Pengadaan (Procurement) Berbasis Openerp Dengan Metode Soft System Methodology (Studi Kasus RSUD Al Ihsan)"},{"key":"ref3","first-page":"3315","volume":"5","author":"rasyid","year":"2018","journal-title":"Pengembangan Green ERP Modul Procurement Untuk Industri Penyamakan Kulit Dengan Metode ASAP"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1016\/j.protcy.2013.12.058","article-title":"Enterprise Resource Planning (ERP) System Implementation: A Case for User Participation","volume":"9","author":"matende","year":"2013","journal-title":"Procedia Technol"},{"key":"ref5","first-page":"108","article-title":"Pengembangan Sistem Informasi Berbasis Enterprise Resource Planning Modul Purchasing (MM-PUR) Pada SAP Dengan Metode ASAP Di PT Unggul Jaya Sejahtera","volume":"3","author":"putri","year":"2016","journal-title":"J Rekayasa Sist Ind"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1007\/BF03326014"},{"key":"ref7","first-page":"14","volume":"4","author":"wu","year":"2015","journal-title":"The Carbon Footprint Calculation Model of the Integrated ERP Framework-Green Production"},{"key":"ref2","first-page":"421","article-title":"Towards Green ERP Systems: The selection driven perspective","author":"boltena","year":"0","journal-title":"Proc 28th EnviroInfo 2014 Conference"},{"journal-title":"The Effectiveness of Enterprise Resource Planning-Erp Implementation in Manufacturing","year":"2016","author":"yong","key":"ref1"},{"key":"ref9","first-page":"4426","volume":"4","author":"sembiring","year":"2017","journal-title":"Usulan Perencanaan Dan Pengendalian Aktivitas Distribusi Pulp Di PT XYZ Untuk Meningkatkan Kemampuan Pemenuhan Permintaan Setiap Distribution Center (DC) Menggunakan Metode Distribution Requirement Planning (DRP)"}],"event":{"name":"2019 International Conference on Electrical Engineering and Informatics (ICEEI)","start":{"date-parts":[[2019,7,9]]},"location":"Bandung, Indonesia","end":{"date-parts":[[2019,7,10]]}},"container-title":["2019 International Conference on Electrical Engineering and Informatics (ICEEI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8966551\/8988782\/08988889.pdf?arnumber=8988889","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,28]],"date-time":"2025-07-28T19:41:17Z","timestamp":1753731677000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8988889\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,7]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/iceei47359.2019.8988889","relation":{},"subject":[],"published":{"date-parts":[[2019,7]]}}}