{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,21]],"date-time":"2025-08-21T18:00:25Z","timestamp":1755799225375,"version":"3.44.0"},"reference-count":16,"publisher":"IEEE","license":[{"start":{"date-parts":[[2016,8,1]],"date-time":"2016-08-01T00:00:00Z","timestamp":1470009600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2016,8,1]],"date-time":"2016-08-01T00:00:00Z","timestamp":1470009600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,8]]},"DOI":"10.1109\/icinfa.2016.7831860","type":"proceedings-article","created":{"date-parts":[[2017,2,7]],"date-time":"2017-02-07T16:25:40Z","timestamp":1486484740000},"page":"415-418","source":"Crossref","is-referenced-by-count":0,"title":["Reason analysis and comprehensive control measures for a certain type of disc insulator leakage in GIS"],"prefix":"10.1109","author":[{"given":"Yutong","family":"Chen","sequence":"first","affiliation":[{"name":"State Grid Shanxi Electric Power Research Institute, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yang","family":"Bai","sequence":"additional","affiliation":[{"name":"State Grid Shanxi Electric Power Research Institute, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tianzheng","family":"Wang","sequence":"additional","affiliation":[{"name":"State Grid Shanxi Electric Power Research Institute, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hua","family":"Yu","sequence":"additional","affiliation":[{"name":"State Grid Shanxi Electric Power Research Institute, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhumao","family":"Lu","sequence":"additional","affiliation":[{"name":"State Grid Shanxi Electric Power Research Institute, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yongxiang","family":"Li","sequence":"additional","affiliation":[{"name":"State Grid Shanxi Electric Power Research Institute, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liqiang","family":"Ma","sequence":"additional","affiliation":[{"name":"State Grid Shanxi Electric Power Research Institute, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yang","family":"Liu","sequence":"additional","affiliation":[{"name":"Linfen Branch Skill Training Center of SEPC, Linfen, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"139","article-title":"Analysis on reason for a GIS earth fault","volume":"48","author":"tao","year":"2012","journal-title":"High Voltage Apparatus"},{"key":"ref11","first-page":"359","article-title":"Analysis on gas leakage and overproof moisture in the gas-insulated metal-enclosed switchgear to fangcun substation","volume":"44","author":"li","year":"2007","journal-title":"High Voltage Apparatus"},{"journal-title":"Practical technology for SF6 Switch","year":"2004","author":"chen","key":"ref12"},{"key":"ref13","first-page":"49","article-title":"Quality control for installation of GIS","volume":"27","author":"chen","year":"2006","journal-title":"Electric Power Instruction"},{"key":"ref14","first-page":"27","article-title":"Improve the success rate of resolving the gas leak of GIS equipment","volume":"6","author":"li","year":"2010","journal-title":"SHANDONG DIANLI JISHU"},{"key":"ref15","first-page":"74","article-title":"Brief introduction about SF6 maintenance, overhall and management of totally-enclosed combined electrical apparatus","volume":"32","author":"hou","year":"2006","journal-title":"Water Power"},{"journal-title":"Operatjion Maintenance and Fault Handling about GIS Equipment","year":"2013","author":"zuo","key":"ref16"},{"key":"ref4","first-page":"35","article-title":"Field process technique for GIS device leakage","volume":"7","author":"tian","year":"2008","journal-title":"DONGBEI ELECTRIC POWER"},{"key":"ref3","first-page":"118","article-title":"Cause analysis of a 220kV GIS leakage and disc insulator breakage","volume":"25","author":"zhou","year":"2012","journal-title":"Guangdong Electric Power"},{"key":"ref6","first-page":"78","article-title":"Operation condition analysis for GIS in state grid corporation of China","volume":"45","author":"song","year":"2009","journal-title":"High Voltage Apparatus"},{"key":"ref5","first-page":"56","article-title":"On-line detection and diagnosis for a component loosing fault in GIS","volume":"46","author":"gao","year":"2010","journal-title":"High Voltage Apparatus"},{"journal-title":"Typical Fault Case Complication about High-voltage Swichgear","year":"2012","key":"ref8"},{"journal-title":"GIS Device and its Insulation Technology","year":"2007","author":"qiu","key":"ref7"},{"key":"ref2","first-page":"99","article-title":"Comprehensive analysis of an insulation fault in GIS","volume":"48","author":"li","year":"2012","journal-title":"High Voltage Apparatus"},{"key":"ref1","first-page":"89","article-title":"550kV hibrid gas insulated switchgear and its application","volume":"46","author":"xia","year":"2010","journal-title":"High Voltage Apparatus"},{"key":"ref9","first-page":"95","article-title":"Analysis and solution to a 126kV GIS equipment fault","volume":"46","author":"sun","year":"2010","journal-title":"High Voltage Apparatus"}],"event":{"name":"2016 IEEE International Conference on Information and Automation (ICIA)","start":{"date-parts":[[2016,8,1]]},"location":"Ningbo, China","end":{"date-parts":[[2016,8,3]]}},"container-title":["2016 IEEE International Conference on Information and Automation (ICIA)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7811905\/7831787\/07831860.pdf?arnumber=7831860","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,19]],"date-time":"2025-08-19T18:09:13Z","timestamp":1755626953000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/7831860\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,8]]},"references-count":16,"URL":"https:\/\/doi.org\/10.1109\/icinfa.2016.7831860","relation":{},"subject":[],"published":{"date-parts":[[2016,8]]}}}