{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,21]],"date-time":"2026-03-21T19:16:54Z","timestamp":1774120614317,"version":"3.50.1"},"reference-count":10,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,9,23]],"date-time":"2023-09-23T00:00:00Z","timestamp":1695427200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,9,23]],"date-time":"2023-09-23T00:00:00Z","timestamp":1695427200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,9,23]]},"DOI":"10.1109\/iciscae59047.2023.10393728","type":"proceedings-article","created":{"date-parts":[[2024,1,22]],"date-time":"2024-01-22T18:32:54Z","timestamp":1705948374000},"page":"347-350","source":"Crossref","is-referenced-by-count":2,"title":["Research on the Application of Indoor and Outdoor Inspection Robots in a 110kV Boosting Station of a Solar Power Plant"],"prefix":"10.1109","author":[{"given":"Kuiyong","family":"Chen","sequence":"first","affiliation":[{"name":"Hubei Energy Group Co.,Ltd.,Wuhan,China"}]},{"given":"Hangbing","family":"Zeng","sequence":"additional","affiliation":[{"name":"Hubei Energy Group New Energy Development Co., Ltd.,Wuhan,China"}]},{"given":"Wen","family":"Wang","sequence":"additional","affiliation":[{"name":"Hubei Energy Group New Energy Development Co., Ltd.,Wuhan,China"}]},{"given":"Yuanpeng","family":"Luo","sequence":"additional","affiliation":[{"name":"Power Engineering Consulting Group,Central Southern China Electric Power Design Institute of China,Wuhan,China"}]},{"given":"Litao","family":"Xiao","sequence":"additional","affiliation":[{"name":"Hubei Energy Group New Energy Development Co., Ltd.,Wuhan,China"}]},{"given":"Hui","family":"Xu","sequence":"additional","affiliation":[{"name":"Power Engineering Consulting Group,Central Southern China Electric Power Design Institute of China,Wuhan,China"}]}],"member":"263","reference":[{"issue":"03","key":"ref1","first-page":"59","article-title":"Application of inspection robot in substation operation and maintenance[J]","volume":"2022","author":"QUAN","journal-title":"metallurgical power"},{"issue":"6","key":"ref2","first-page":"16","article-title":"Application status and optimization of intelligent inspection robot[J]","volume":"29","author":"MING","year":"2022","journal-title":"Qutlook of Electronic Technology"},{"issue":"2","key":"ref3","first-page":"82","article-title":"Design and Application of Robot Inspection System in Substation[J]","volume":"51","author":"XIANGYANG","year":"2018","journal-title":"Electric Power"},{"key":"ref4","volume-title":"Design and implementation of substation inspection robot[D]","author":"KUN","year":"2018"},{"issue":"9","key":"ref5","first-page":"57","article-title":"Substation Intelligent Robot Inspection System and its application case analysis[J]","author":"CHAO","year":"2021","journal-title":"Lamps and Lighting"},{"issue":"21","key":"ref6","first-page":"158","article-title":"Application analysis of Substation Intelligent Inspection Robot[J]","author":"PING","year":"2014","journal-title":"Inner Mongolia Science Technology and Economy"},{"issue":"2","key":"ref7","first-page":"26","article-title":"A survey of electric power intelligent inspection robot[J]","volume":"57","author":"SHAN","year":"2020","journal-title":"Review of electric power intelligent inspection robot"},{"issue":"9","key":"ref8","first-page":"69","article-title":"Research on the Application of Inspection Robot for 500kV Self-service Substations[J]","volume":"33","author":"YUEFAN","year":"2016","journal-title":"Distribution & Utilization"},{"issue":"5","key":"ref9","first-page":"83","article-title":"Research of Inspection Robot for 35 kV Small Substation[J]","volume":"44","author":"JING","year":"2016","journal-title":"Yunnan Electric Power Technology"},{"key":"ref10","volume-title":"Research on Substation Inspection Robot Development and Path Planning[D]","author":"YA","year":"2019"}],"event":{"name":"2023 IEEE 6th International Conference on Information Systems and Computer Aided Education (ICISCAE)","location":"Dalian, China","start":{"date-parts":[[2023,9,23]]},"end":{"date-parts":[[2023,9,25]]}},"container-title":["2023 IEEE 6th International Conference on Information Systems and Computer Aided Education (ICISCAE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10391857\/10391858\/10393728.pdf?arnumber=10393728","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,1]],"date-time":"2024-02-01T02:25:40Z","timestamp":1706754340000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10393728\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,9,23]]},"references-count":10,"URL":"https:\/\/doi.org\/10.1109\/iciscae59047.2023.10393728","relation":{},"subject":[],"published":{"date-parts":[[2023,9,23]]}}}