{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,2]],"date-time":"2026-03-02T14:55:13Z","timestamp":1772463313639,"version":"3.50.1"},"reference-count":9,"publisher":"IEEE","license":[{"start":{"date-parts":[[2022,8,22]],"date-time":"2022-08-22T00:00:00Z","timestamp":1661126400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2022,8,22]],"date-time":"2022-08-22T00:00:00Z","timestamp":1661126400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022,8,22]]},"DOI":"10.1109\/icit48603.2022.10002739","type":"proceedings-article","created":{"date-parts":[[2023,1,5]],"date-time":"2023-01-05T19:09:43Z","timestamp":1672945783000},"page":"1-6","source":"Crossref","is-referenced-by-count":3,"title":["Vehicle Scheduling for Steel Logistics Based on Vehicle Batching"],"prefix":"10.1109","author":[{"given":"Weixiang","family":"Wen","sequence":"first","affiliation":[{"name":"Fuzhou University, and Key Laboratory of Industrial Automation Control Technology and Information Processing,College of Electrical Engineering and Automation,Education Department of Fujian Province,Fuzhou,China,350000"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kang","family":"Chen","sequence":"additional","affiliation":[{"name":"Fuzhou University, and Key Laboratory of Industrial Automation Control Technology and Information Processing,College of Electrical Engineering and Automation,Education Department of Fujian Province,Fuzhou,China,350000"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jinlong","family":"Wang","sequence":"additional","affiliation":[{"name":"Fuzhou University, and Key Laboratory of Industrial Automation Control Technology and Information Processing,College of Electrical Engineering and Automation,Education Department of Fujian Province,Fuzhou,China,350000"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhezhuang","family":"Xu","sequence":"additional","affiliation":[{"name":"Fuzhou University, and Key Laboratory of Industrial Automation Control Technology and Information Processing,College of Electrical Engineering and Automation,Education Department of Fujian Province,Fuzhou,China,350000"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rong","family":"Wang","sequence":"additional","affiliation":[{"name":"Fuzhou University, and Key Laboratory of Industrial Automation Control Technology and Information Processing,College of Electrical Engineering and Automation,Education Department of Fujian Province,Fuzhou,China,350000"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Boyu","family":"Chen","sequence":"additional","affiliation":[{"name":"Sansteel Minguang Co., Ltd., Fujian,Sanming,China,353000"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qingdong","family":"Zhang","sequence":"additional","affiliation":[{"name":"Sansteel Minguang Co., Ltd., Fujian,Sanming,China,353000"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1007\/s00357-018-9259-9"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.512620"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.3390\/app10196816"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.23919\/IConAC.2018.8749065"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TVT.2022.3173989"},{"key":"ref6","first-page":"132","article-title":"A multi-objective genetic algorithm (moga) for hybrid flow shop scheduling problem with assembly operation","volume":"10","author":"hosseini","year":"2017","journal-title":"Journal of Industrial and Systems Engineering"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1550269"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2019.2944980"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.promfg.2020.02.053"}],"event":{"name":"2022 IEEE International Conference on Industrial Technology (ICIT)","location":"Shanghai, China","start":{"date-parts":[[2022,8,22]]},"end":{"date-parts":[[2022,8,25]]}},"container-title":["2022 IEEE International Conference on Industrial Technology (ICIT)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10002706\/10002716\/10002739.pdf?arnumber=10002739","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,7]],"date-time":"2023-02-07T19:22:32Z","timestamp":1675797752000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10002739\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,8,22]]},"references-count":9,"URL":"https:\/\/doi.org\/10.1109\/icit48603.2022.10002739","relation":{},"subject":[],"published":{"date-parts":[[2022,8,22]]}}}