{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T01:35:13Z","timestamp":1740101713997,"version":"3.37.3"},"reference-count":8,"publisher":"IEEE","license":[{"start":{"date-parts":[[2022,11,11]],"date-time":"2022-11-11T00:00:00Z","timestamp":1668124800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2022,11,11]],"date-time":"2022-11-11T00:00:00Z","timestamp":1668124800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"funder":[{"DOI":"10.13039\/501100015282","name":"China Academy of Railway Sciences","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100015282","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022,11,11]]},"DOI":"10.1109\/icite56321.2022.10101463","type":"proceedings-article","created":{"date-parts":[[2023,4,18]],"date-time":"2023-04-18T17:29:17Z","timestamp":1681838957000},"page":"134-139","source":"Crossref","is-referenced-by-count":0,"title":["Proxy Model Construction for Aerodynamic Effects of High-Speed Trains in Tunnels and Research on Optimization Method of Key Parameters of High-Speed Railway"],"prefix":"10.1109","author":[{"given":"Kexin","family":"Zhang","sequence":"first","affiliation":[{"name":"Railway Science and technology Research and Development Center China Academy of Railway Sciences Group Co., Ltd,Beijng,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ning","family":"Xu","sequence":"additional","affiliation":[{"name":"Railway Science and technology Research and Development Center China Academy of Railway Sciences Group Co., Ltd,Beijng,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Aijun","family":"Cheng","sequence":"additional","affiliation":[{"name":"Railway Architecture Research Institute China Academy of Railway Sciences Group Co., Ltd,Beijng,China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"issue":"01","key":"ref1","first-page":"56","article-title":"Yang Qingshan Research on aerodynamic comfort of high-speed train passing in tunnel [J]","volume":"41","author":"Yaguang","year":"2017","journal-title":"Journal of Beijing Jiaotong University"},{"issue":"03","key":"ref2","first-page":"608","article-title":"Effect of altitude on transient pressure in railway tunnels and ride comfort in carriages[J]","volume":"19","author":"Juan","year":"2022","journal-title":"Journal of Railway Science and Engineering"},{"issue":"02","key":"ref3","first-page":"125","article-title":"Chen Chunjun Research on the influence of pressure fluctuation in the vehicle on passenger comfort [J]","volume":"40","author":"Feng","year":"2014","journal-title":"China test"},{"issue":"05","key":"ref4","first-page":"56","article-title":"Influence of vehicle-tunnel blockage ratio on aerodynamic pressure characteristics of high-speed railway tunnel walls[J]","volume":"50","author":"Jianming","year":"2022","journal-title":"Journal of South China University of Technology (Natural Science Edition)"},{"issue":"02","key":"ref5","first-page":"96","article-title":"Analysis of aerodynamic effects and clearance area in 400 km\/h+ high-speed railway tunnel[J]","volume":"12","author":"Luxen","year":"2021","journal-title":"High-speed Railway Technology"},{"issue":"07","key":"ref6","first-page":"1118","article-title":"Exploration of 400 km\/h high-speed railway tunnel clearance area based on transient pressure changes in the vehicle[J]","volume":"39","author":"Xianming","year":"2019","journal-title":"Tunnel Construction (in English and Chinese)"},{"volume-title":"Supplementary provisions for relevant standards of railway tunnel design and construction [Z]","year":"2007","key":"ref7"},{"issue":"06","key":"ref8","first-page":"26","article-title":"Real vehicle test research on the most unfavorable length of high-speed trains crossing in tunnel [J]","volume":"37","author":"Yang","year":"2017","journal-title":"Railway rolling stock"}],"event":{"name":"2022 IEEE 7th International Conference on Intelligent Transportation Engineering (ICITE)","start":{"date-parts":[[2022,11,11]]},"location":"Beijing, China","end":{"date-parts":[[2022,11,13]]}},"container-title":["2022 IEEE 7th International Conference on Intelligent Transportation Engineering (ICITE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10100965\/10101375\/10101463.pdf?arnumber=10101463","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,14]],"date-time":"2024-03-14T09:33:23Z","timestamp":1710408803000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10101463\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,11,11]]},"references-count":8,"URL":"https:\/\/doi.org\/10.1109\/icite56321.2022.10101463","relation":{},"subject":[],"published":{"date-parts":[[2022,11,11]]}}}