{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T01:26:14Z","timestamp":1730251574410,"version":"3.28.0"},"reference-count":8,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010,8]]},"DOI":"10.1109\/icnc.2010.5582984","type":"proceedings-article","created":{"date-parts":[[2010,9,29]],"date-time":"2010-09-29T18:03:07Z","timestamp":1285783387000},"page":"2652-2655","source":"Crossref","is-referenced-by-count":1,"title":["Optimal operation of hydropower station unit based on ant colony algorithm"],"prefix":"10.1109","author":[{"given":"Jingping","family":"Zhang","sequence":"first","affiliation":[]},{"given":"Qiang","family":"Huang","sequence":"additional","affiliation":[]},{"given":"Xuehua","family":"Zhao","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref4","first-page":"6","article-title":"Generalized Ant Colony Optimization Algorithm for Reactive Power Optimization in Power Systems [J]","volume":"30","author":"zhaohua","year":"2003","journal-title":"Journal of North China Electric Power University"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/S0167-739X(99)00124-7"},{"journal-title":"Operational Research (Revised Version) [M]","first-page":"194","year":"1990","key":"ref6"},{"journal-title":"Hydropower Station Economic Operation Theory [M]","year":"1998","author":"yongchuan","key":"ref5"},{"key":"ref8","first-page":"381","article-title":"The Optimal Selection on the Parameters of the Ant Colony Algorithm [J]","volume":"19","author":"zhan","year":"2003","journal-title":"Bulletin of Science and Technology"},{"key":"ref7","first-page":"51","article-title":"A New Calculation Method for Active Power Economic Distribution in Electric System. [J]","author":"jinzhong","year":"1998","journal-title":"Shanxi Electric Power"},{"journal-title":"The Ant Colony Optimization Meta-Heuristic New ideas in Optimization [M]","year":"1999","author":"dorigo","key":"ref2"},{"key":"ref1","first-page":"22","article-title":"A Method for Hydro Station Economic Dispatch Based on the Evolution Program [J]","author":"jianguo","year":"2000","journal-title":"Journal of Hydroelectric engineering"}],"event":{"name":"2010 Sixth International Conference on Natural Computation (ICNC)","start":{"date-parts":[[2010,8,10]]},"location":"Yantai, China","end":{"date-parts":[[2010,8,12]]}},"container-title":["2010 Sixth International Conference on Natural Computation"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/5564900\/5582346\/05582984.pdf?arnumber=5582984","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,21]],"date-time":"2017-03-21T08:48:39Z","timestamp":1490086119000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/5582984\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,8]]},"references-count":8,"URL":"https:\/\/doi.org\/10.1109\/icnc.2010.5582984","relation":{},"subject":[],"published":{"date-parts":[[2010,8]]}}}