{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T01:25:28Z","timestamp":1730251528342,"version":"3.28.0"},"reference-count":24,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,8]]},"DOI":"10.1109\/icnc.2014.6975859","type":"proceedings-article","created":{"date-parts":[[2014,12,10]],"date-time":"2014-12-10T11:45:28Z","timestamp":1418211928000},"page":"343-348","source":"Crossref","is-referenced-by-count":0,"title":["Solving bi-objective flow shop problem with multi-objective path relinking algorithm"],"prefix":"10.1109","author":[{"given":"Rong-Qiang","family":"Zeng","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ming-Sheng","family":"Shang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"1219","volume":"38","author":"dubois-lac\u00f3ste","year":"2011","journal-title":"A hybrid TP+PL S algorithm for bi-objective flow-shop scheduling problems"},{"key":"ref11","first-page":"653","volume":"29","author":"glover","year":"1999","journal-title":"Fundamentals of scatter search and path relinking"},{"key":"ref12","first-page":"287","volume":"5","author":"graham","year":"1979","journal-title":"Optimization and Approximation in Deterministic Sequencing and Scheduling A Survey"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/MIS.2005.74"},{"key":"ref14","volume":"13","author":"jozefowiez","year":"2007","journal-title":"Target aiming pareto search and its application to the vehicle routing problem with route balancing"},{"key":"ref15","first-page":"294","volume":"4150","author":"pasia","year":"2006","journal-title":"Solving a bi-objective flowshop scheduling problem by pareto-ant colony optimization"},{"key":"ref16","first-page":"45","volume":"6","author":"reeves","year":"1998","journal-title":"Genetic algorithms path relinking and the flowshop sequencing problem"},{"key":"ref17","first-page":"2033","volume":"177","author":"ruiz","year":"2007","journal-title":"A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem"},{"key":"ref18","first-page":"3143","volume":"34","author":"schiavinotto","year":"2011","journal-title":"A review of metrics on permutations for search landscape analysis"},{"key":"ref19","first-page":"65","volume":"47","author":"taillard","year":"1990","journal-title":"Some efficient heuristic methods for flow-shop sequencing"},{"key":"ref4","first-page":"120","author":"basseur","year":"2005","journal-title":"Path relinking in pareto multi-objective genetic algorithms"},{"key":"ref3","first-page":"263","volume":"18","author":"basseur","year":"2012","journal-title":"The efficiency of indicator-based local search for multi-objective combinatorial optimisation problems"},{"key":"ref6","first-page":"264","volume":"5101","author":"bozejko","year":"2008","journal-title":"Parallel path-relinking method for the flow shop scheduling problem"},{"key":"ref5","first-page":"1381","author":"basseur","year":"2011","journal-title":"Neural Computing and Applications"},{"journal-title":"Introduction to Algorithms","year":"1990","author":"cormen","key":"ref8"},{"key":"ref7","first-page":"578","volume":"2632","author":"brizuela","year":"2003","journal-title":"Experimental genetic operators analysis for the multi-objective permutation flowshop"},{"key":"ref2","first-page":"717","volume":"167","author":"arroyo","year":"2005","journal-title":"Genetic local search for multi-objective flowshop scheduling problems"},{"key":"ref1","volume":"10","author":"armentano","year":"2004","journal-title":"An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1287\/moor.15.3.483"},{"key":"ref20","first-page":"278","volume":"64","author":"taillard","year":"1993","journal-title":"Benchmarks for basic scheduling problems"},{"key":"ref22","volume":"13","author":"zeng","year":"2013","journal-title":"Solving bi-objective flow shop problem with hybrid path relinking algorithm"},{"key":"ref21","first-page":"57","volume":"38","author":"vallada","year":"2010","journal-title":"Genetic alogrithms with path relinking for the minimum tardiness permutation flowshop problem"},{"key":"ref24","first-page":"257","volume":"3","author":"zitzler","year":"1999","journal-title":"Multiobjective evolutionary algorithms A comparative case study and the strength pareto approach Evolutionary Computation"},{"key":"ref23","first-page":"832","author":"zitzler","year":"2004","journal-title":"Indicator-based Selection in Multiobjective Search"}],"event":{"name":"2014 10th International Conference on Natural Computation (ICNC)","start":{"date-parts":[[2014,8,19]]},"location":"Xiamen","end":{"date-parts":[[2014,8,21]]}},"container-title":["2014 10th International Conference on Natural Computation (ICNC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6963214\/6975799\/06975859.pdf?arnumber=6975859","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,8,10]],"date-time":"2017-08-10T16:42:35Z","timestamp":1502383355000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6975859\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,8]]},"references-count":24,"URL":"https:\/\/doi.org\/10.1109\/icnc.2014.6975859","relation":{},"subject":[],"published":{"date-parts":[[2014,8]]}}}