{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,1]],"date-time":"2026-06-01T13:02:35Z","timestamp":1780318955238,"version":"3.54.1"},"reference-count":7,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,11]]},"DOI":"10.1109\/icsai.2016.7810971","type":"proceedings-article","created":{"date-parts":[[2017,1,9]],"date-time":"2017-01-09T21:44:14Z","timestamp":1483998254000},"page":"297-300","source":"Crossref","is-referenced-by-count":5,"title":["Analyses and comparisons of SCL files in substation configurator"],"prefix":"10.1109","author":[{"given":"Peng","family":"Xi","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Liang","family":"Yongchao","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Luo","family":"Zhiping","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pan","family":"Feilai","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Li","family":"Long","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"ref4","first-page":"24","article-title":"Maintainability Analysis of Substation Automation System Based on IEC61850","volume":"5","author":"xiang","year":"2014","journal-title":"Electricity"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2006.886788"},{"key":"ref6","first-page":"90","article-title":"Study on the interoperability implementation of the products by using IEC 61850","volume":"29","author":"zhang","year":"2005","journal-title":"Dianli Xitong Zidonghue"},{"key":"ref5","first-page":"62","article-title":"Study on IEC61850 communication protocol architecture","volume":"24","author":"yanming","year":"2000","journal-title":"Automation of Electric Power Systems"},{"key":"ref7","first-page":"79","article-title":"A pilot project for testing the standard drafts for open communication in substations-First experiences with the future standard IEC 61850","volume":"5","author":"haud","year":"1999","journal-title":"IEEE Trans on Power Delivery"},{"key":"ref2","first-page":"61","article-title":"Development of the integrated online-monitoring system for the insulation of power equipment in the transformer substation","volume":"33","author":"cheng","year":"2007","journal-title":"Gaodianya Jishu\/High Voltage Engineering"},{"key":"ref1","first-page":"20","article-title":"The Development of Intergrated Automation System of Digital Transformer Station","volume":"4","author":"daxin","year":"2001","journal-title":"Electrotechnical Journal"}],"event":{"name":"2016 3rd International Conference on Systems and Informatics (ICSAI)","location":"Shanghai, China","start":{"date-parts":[[2016,11,19]]},"end":{"date-parts":[[2016,11,21]]}},"container-title":["2016 3rd International Conference on Systems and Informatics (ICSAI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7794486\/7810917\/07810971.pdf?arnumber=7810971","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,1,21]],"date-time":"2017-01-21T05:04:51Z","timestamp":1484975091000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7810971\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,11]]},"references-count":7,"URL":"https:\/\/doi.org\/10.1109\/icsai.2016.7810971","relation":{},"subject":[],"published":{"date-parts":[[2016,11]]}}}