{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T02:55:36Z","timestamp":1730256936800,"version":"3.28.0"},"reference-count":12,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T00:00:00Z","timestamp":1572566400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"},{"start":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T00:00:00Z","timestamp":1572566400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,11,1]],"date-time":"2019-11-01T00:00:00Z","timestamp":1572566400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,11]]},"DOI":"10.1109\/icsai48974.2019.9010212","type":"proceedings-article","created":{"date-parts":[[2020,2,28]],"date-time":"2020-02-28T09:58:47Z","timestamp":1582883927000},"page":"202-208","source":"Crossref","is-referenced-by-count":0,"title":["Analysis and Suggestions on Peak Shaving of Hunan AC-DC Hybrid Power Grid with Large-scale New Energy"],"prefix":"10.1109","author":[{"given":"Meng","family":"Xiang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Min","family":"Tan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref4","first-page":"128","article-title":"Analysis on peak load regulation performance of Beijing-Tianjin-Tangshan power grid with wind farms connected [J]","volume":"33","author":"li","year":"2009","journal-title":"Power System Technology"},{"key":"ref3","first-page":"12","article-title":"Evaluation on peak load balance of power system accessed by large-scale wind power [J]","volume":"42","author":"zhang","year":"2014","journal-title":"Shanxi Electric Power"},{"key":"ref10","first-page":"22?26","article-title":"Peak-load regulation adequacy evaluation of Power System with high wind power penetration based on states clustering [J]","author":"yang","year":"2017","journal-title":"Shaanxi Electric Power"},{"key":"ref6","first-page":"3503","article-title":"Analysis and assessment of operation risk for power system with large-scale wind power integration [J]","volume":"40","author":"li","year":"2016","journal-title":"Power System Technology"},{"key":"ref11","first-page":"70","article-title":"Evaluation and application of wind power capacity connected to power grid[J]","volume":"35","author":"sun","year":"2011","journal-title":"Automation of Electric Power Systems"},{"key":"ref5","first-page":"9","article-title":"Flexibility evaluation and supply\/demand balance principle of power system with high penetration renewable electricity [J]","volume":"37","author":"zongxiang","year":"2017","journal-title":"Proceedings of the CSEE"},{"key":"ref12","first-page":"159","article-title":"Research on the control of electric vehicles with V2G function in peak regulation [J]","author":"hunang","year":"2016","journal-title":"Mechanical and Electrical Information"},{"key":"ref8","first-page":"1446","article-title":"Analysis on peak load regulation capability of power grid integrated with wind farms in valley load period [J]","volume":"38","author":"yang","year":"2014","journal-title":"Power System Technology"},{"key":"ref7","first-page":"129","article-title":"A computing method for peak load regulation ability of northwest China power grid connected with large-scale wind farms [J]","volume":"34","author":"lidong","year":"2010","journal-title":"Power System Technology"},{"key":"ref2","first-page":"105","article-title":"Analysis on peak load regulation operation characteristic of power system integrated with large-scale wind power[J]","volume":"28","author":"hou","year":"2013","journal-title":"Transactions of China Electrotechnical Society"},{"key":"ref9","first-page":"1?5","article-title":"Load characteristics analysis and peak margin calculation of Beijing-Tianjin - Northern Hebei Power Grid [J]","author":"cheng","year":"2015","journal-title":"North China Electric Power"},{"key":"ref1","first-page":"3503","article-title":"Analysis and of operation risk for power system with large-scale integration [J]","volume":"40","author":"jinghua","year":"2016","journal-title":"Power System Technology"}],"event":{"name":"2019 6th International Conference on Systems and Informatics (ICSAI)","start":{"date-parts":[[2019,11,2]]},"location":"Shanghai, China","end":{"date-parts":[[2019,11,4]]}},"container-title":["2019 6th International Conference on Systems and Informatics (ICSAI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8974456\/9010069\/09010212.pdf?arnumber=9010212","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,17]],"date-time":"2022-07-17T21:46:27Z","timestamp":1658094387000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9010212\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,11]]},"references-count":12,"URL":"https:\/\/doi.org\/10.1109\/icsai48974.2019.9010212","relation":{},"subject":[],"published":{"date-parts":[[2019,11]]}}}