{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T02:46:56Z","timestamp":1730256416857,"version":"3.28.0"},"reference-count":20,"publisher":"IEEE","license":[{"start":{"date-parts":[[2022,12,10]],"date-time":"2022-12-10T00:00:00Z","timestamp":1670630400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2022,12,10]],"date-time":"2022-12-10T00:00:00Z","timestamp":1670630400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022,12,10]]},"DOI":"10.1109\/icsai57119.2022.10005389","type":"proceedings-article","created":{"date-parts":[[2023,1,9]],"date-time":"2023-01-09T21:28:16Z","timestamp":1673299696000},"page":"1-10","source":"Crossref","is-referenced-by-count":1,"title":["Setting Calculation Method and Protection Coordination for Relay Protection System in Consideration of Arc Flash"],"prefix":"10.1109","author":[{"given":"Fang","family":"Jinghui","sequence":"first","affiliation":[{"name":"Institute Co.,Jiaxing Hengchuang Electric Power Design &#x0026; Research,Jiaxing,China"}]},{"given":"Zhang","family":"Bo","sequence":"additional","affiliation":[{"name":"Institute Co.,Jiaxing Hengchuang Electric Power Design &#x0026; Research,Jiaxing,China"}]},{"given":"Zhong","family":"Weidong","sequence":"additional","affiliation":[{"name":"Institute Co.,Jiaxing Hengchuang Electric Power Design &#x0026; Research,Jiaxing,China"}]},{"given":"Feng","family":"Jian","sequence":"additional","affiliation":[{"name":"State Grid Jiaxing Electric Power Supply Company,Jiaxing,China"}]},{"given":"Jin","family":"Guozhong","sequence":"additional","affiliation":[{"name":"State Grid Jiaxing Electric Power Supply Company,Jiaxing,China"}]},{"given":"Gao","family":"Xijun","sequence":"additional","affiliation":[{"name":"Beijing Zhizhong Energy Technology Development Co.,Ltd.,Beijing,China"}]},{"given":"Wei","family":"Ling","sequence":"additional","affiliation":[{"name":"Beijing Zhizhong Energy Technology Development Co.,Ltd.,Beijing,China"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1186\/s41601-017-0061-1"},{"volume-title":"Hazard and control of arc flash fault","year":"2018","author":"Das","key":"ref2"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.1982.4504068"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/28.821823"},{"issue":"5","key":"ref5","first-page":"14","article-title":"Calculation and analysis of multiple reignition arc VFTO based on subsection arc model","volume":"52","author":"Jiangong","year":"2016","journal-title":"high-voltage electrical apparatus"},{"key":"ref6","first-page":"74","article-title":"Analysis of the validity of solid phase airflow to arc extinction based on Mayer arc model","volume":"3","author":"Li","year":"2020","journal-title":"Insulators and Surge Arresters"},{"issue":"10","key":"ref7","first-page":"8","article-title":"Simulation and analysis of arc grounding fault based on combined Mayr and Cassie arc models","volume":"56","author":"Mingbo","year":"2019","journal-title":"Electrical Measurement and Instrumentation"},{"issue":"16","key":"ref8","first-page":"115","article-title":"Research on an arc model of a disconnector for conduction interference of a Rogowski coil electronic transformer","volume":"48","author":"Zhenhua","year":"2020","journal-title":"Power System Protection and Control"},{"issue":"16","key":"ref9","first-page":"115","article-title":"Analysis of the arc high impedance grounding faults voltage characteristics in non-effective grounding feeders","volume":"47","author":"Jin","year":"2019","journal-title":"Power System Protection and Control"},{"volume-title":"Guide for performing arc-flash hazard calculations: IEEE 1584-2018[S]","key":"ref10"},{"issue":"14","key":"ref11","first-page":"160","article-title":"Analysis of electric arc flash protection principle and development application of its standard calibration equipment","volume":"47","author":"Xinmei","year":"2019","journal-title":"Power System Protection and Control"},{"issue":"11","key":"ref12","first-page":"44","article-title":"Application and setting for fault arc protection","volume":"18","author":"Dayong","year":"2015","journal-title":"Guizhou Electric Power Technology"},{"volume-title":"Typical Design of 35kV Transformer Substation of State Grid Corporation","year":"2007","author":"Zhenya","key":"ref13"},{"volume-title":"Typical Design of Power Demand Side 10kV Distribution System","year":"2011","author":"Yue","key":"ref14"},{"journal-title":"Technical Guidelines for Typical Design (Trial) of China Southern Power Grid Corporation 10kV and Below Power Expansion Project Beijing","article-title":"China Southern Power Grid Co. LTD","year":"2012","key":"ref15"},{"issue":"2","key":"ref16","first-page":"22","article-title":"Analysis of relay protection and coordination based on ETAP","volume":"32","author":"Zeju","year":"2015","journal-title":"Petrochemical Design"},{"volume-title":"Technical Specification for relay protection and Safety automatic devices: GB\/T 14285-2006","key":"ref17"},{"volume-title":"Design Specification for relay protection and automatic devices of electric power installations: GB\/T 50062-2008","key":"ref18"},{"volume-title":"Operation setting regulation of 3kV-110kV grid Relay Protection Device: DL\/T 584-2007","key":"ref19"},{"journal-title":"Industrial and Civil Power Supply and Distribution Design Manual","article-title":"China Aeronautical Planning, Design and Research Institute Co., LTD","year":"2016","key":"ref20"}],"event":{"name":"2022 8th International Conference on Systems and Informatics (ICSAI)","start":{"date-parts":[[2022,12,10]]},"location":"Kunming, China","end":{"date-parts":[[2022,12,12]]}},"container-title":["2022 8th International Conference on Systems and Informatics (ICSAI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10005314\/10005319\/10005389.pdf?arnumber=10005389","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,9]],"date-time":"2024-02-09T04:54:29Z","timestamp":1707454469000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10005389\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,12,10]]},"references-count":20,"URL":"https:\/\/doi.org\/10.1109\/icsai57119.2022.10005389","relation":{},"subject":[],"published":{"date-parts":[[2022,12,10]]}}}