{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T02:47:26Z","timestamp":1730256446891,"version":"3.28.0"},"reference-count":6,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,12,16]],"date-time":"2023-12-16T00:00:00Z","timestamp":1702684800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,12,16]],"date-time":"2023-12-16T00:00:00Z","timestamp":1702684800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,12,16]]},"DOI":"10.1109\/icsai61474.2023.10423309","type":"proceedings-article","created":{"date-parts":[[2024,2,9]],"date-time":"2024-02-09T18:24:28Z","timestamp":1707503068000},"page":"1-6","source":"Crossref","is-referenced-by-count":0,"title":["Research on the Evaluation System for Train Service Plan in High-speed Railway based on Operation Efficiency and Effectiveness"],"prefix":"10.1109","author":[{"given":"Zhenhuan","family":"He","sequence":"first","affiliation":[{"name":"Beijing Jiaotong University,School of Traffic and Transportation,Beijing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Luxi","family":"Xue","sequence":"additional","affiliation":[{"name":"Beijing Jiaotong University,School of Traffic and Transportation,Beijing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wenbin","family":"Yang","sequence":"additional","affiliation":[{"name":"China Railway Siyuan Survey and Design Group Co. Ltd,Survey and Design Institute of Urban Rail and Underground Engineering,Wuhan,China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.trb.2016.04.003"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.trb.2015.10.005"},{"issue":"8","key":"ref3","first-page":"13","article-title":"Study on Evaluation and Optimization Method of Multi-Level High-Speed Railway Train Operation Program","volume":"38","author":"Xiucheng","year":"2016","journal-title":"Railway Transport and Economy"},{"article-title":"Evaluation and optimization of high-speed railway\u2019s train plan based on economic return","year":"2018","author":"Liqing","key":"ref4"},{"issue":"12","key":"ref5","first-page":"2509","article-title":"Study on evaluation of highspeed railway train planning based on factor and cluster analysis","volume":"14","author":"Guangqi","year":"2017","journal-title":"Journal of Railway Science and Engineering"},{"issue":"11","key":"ref6","first-page":"2824","article-title":"Evaluation and adjustment of highspeed railway train line plan based on economic benefits","volume":"18","author":"Min","year":"2021","journal-title":"Journal of Railway Science and Engineering"}],"event":{"name":"2023 9th International Conference on Systems and Informatics (ICSAI)","start":{"date-parts":[[2023,12,16]]},"location":"Changsha, China","end":{"date-parts":[[2023,12,18]]}},"container-title":["2023 9th International Conference on Systems and Informatics (ICSAI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10423279\/10423280\/10423309.pdf?arnumber=10423309","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,13]],"date-time":"2024-02-13T12:57:20Z","timestamp":1707829040000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10423309\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,12,16]]},"references-count":6,"URL":"https:\/\/doi.org\/10.1109\/icsai61474.2023.10423309","relation":{},"subject":[],"published":{"date-parts":[[2023,12,16]]}}}