{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,4,28]],"date-time":"2025-04-28T10:26:52Z","timestamp":1745836012455,"version":"3.28.0"},"reference-count":14,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"DOI":"10.1109\/icsmc.2002.1175717","type":"proceedings-article","created":{"date-parts":[[2003,8,27]],"date-time":"2003-08-27T11:02:28Z","timestamp":1061982148000},"page":"6","source":"Crossref","is-referenced-by-count":2,"title":["Three stages flow-shop with job over-passing"],"prefix":"10.1109","volume":"vol.7","author":[{"given":"N.E.H.","family":"Saadani","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.","family":"Guinet","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Moalla","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"journal-title":"Scheduling Theory algorithm and systems","year":"1995","author":"pinedo","key":"ref10"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2003.08.030"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(89)90208-7"},{"key":"ref13","first-page":"222","article-title":"On possibility of approximate solution of a scheduling theory problem","author":"strusevitch","year":"1981","journal-title":"1st All-union Conference on Statistics and Discrete Analysis Non-numerical Information Expert estimates and discrete optimization"},{"journal-title":"Scheduling Theory Multi-Stage Systems","year":"1994","author":"tanarv","key":"ref14"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(00)00022-9"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1287\/moor.1.2.117"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1080\/00207549108948025"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1057\/jors.1988.63"},{"key":"ref8","first-page":"250","volume":"18","author":"narasimhan","year":"1987","journal-title":"A comparison of sequencing rules for a two-stage hybrid flowshop Decision Sciences"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1080\/00207548408942479"},{"key":"ref2","first-page":"429","article-title":"A Branch and Bound Algorithm for the F \/ no &#x2013; idle \/ C max","volume":"1","author":"baptiste","year":"1997","journal-title":"Proc of the Int Conf on Industrial Engineering and Production Management IEPM'97"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1002\/nav.3800290311"},{"year":"1959","key":"ref9"}],"event":{"name":"SMC2002: IEEE International Conference on Systems, Man and Cybernetics","acronym":"ICSMC-02","location":"Yasmine Hammamet, Tunisia"},"container-title":["IEEE International Conference on Systems, Man and Cybernetics"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/8325\/25992\/01175717.pdf?arnumber=1175717","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,13]],"date-time":"2017-03-13T19:27:28Z","timestamp":1489433248000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/1175717\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[null]]},"references-count":14,"URL":"https:\/\/doi.org\/10.1109\/icsmc.2002.1175717","relation":{},"subject":[]}}