{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T16:58:18Z","timestamp":1729616298783,"version":"3.28.0"},"reference-count":25,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010,10]]},"DOI":"10.1109\/icumt.2010.5676609","type":"proceedings-article","created":{"date-parts":[[2011,1,3]],"date-time":"2011-01-03T20:50:24Z","timestamp":1294087824000},"page":"381-388","source":"Crossref","is-referenced-by-count":1,"title":["A new approach for Subtransmission System expansion planning with genetic alghorithm"],"prefix":"10.1109","author":[{"given":"Saeed","family":"Jalilzade","sequence":"first","affiliation":[]},{"given":"Amir","family":"Bagheri","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/59.476047"},{"key":"ref11","doi-asserted-by":"crossref","first-page":"1886","DOI":"10.1109\/59.331446","article-title":"Chopin, a heuristic model for long term transmission expansion planning","volume":"9","author":"la","year":"1994","journal-title":"IEEE Trans Power Syst"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/59.918292"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1985.319049"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1049\/ip-gtd:20000337"},{"key":"ref15","first-page":"307","article-title":"optimal location of Electrical Substations in Regional Energy Supply Systems","author":"yahav","year":"1997","journal-title":"IEEE Transactions on Power Systems"},{"key":"ref16","article-title":"Sitting Distributed Generation to Defer T & D Expansion","author":"brown","year":"2001","journal-title":"IEEE conference 0-7803-7285-9\/01"},{"journal-title":"Adaptive Fuzzy Systems Design and Stability Analysis","year":"2000","author":"li","key":"ref17"},{"key":"ref18","article-title":"Technical and economic evaluation of voltage level in transmission network expansion planning using GA","author":"jalilzadeh","year":"2007","journal-title":"Energy Conversion and Management"},{"key":"ref19","first-page":"1424","article-title":"Transmission expansion network planning considering uncertainness in demand","volume":"2","author":"silva","year":"0","journal-title":"IEEE Power Engineering Society General Meeting 2005"},{"key":"ref4","article-title":"Otimal Planning of Distribution Substation Location and Sizes &#x2014;Model and Algorithm","author":"hongwey","year":"1993","journal-title":"IEEE TENCON"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/S0378-7796(02)00087-1"},{"article-title":"State-of-theart status on transmission networks planning","year":"1987","author":"p\u00e9rez arriaga","key":"ref6"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.873406"},{"article-title":"Modelo de cobertura geogr&#x00E1;fica de una red de distribuci&#x00F3;n de energ&#x00ED;a el&#x00E9;ctrica","year":"2001","author":"peco","key":"ref8"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2003.811168"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/59.331452"},{"article-title":"Static models for long-term transmission planning","year":"1993","author":"latorre","key":"ref9"},{"article-title":"Modern Power System Planning","year":"1994","author":"wang","key":"ref1"},{"key":"ref20","first-page":"318","article-title":"Application of an improved genetic algorithm in transmission network expansion planning","volume":"1","author":"zhiqi","year":"0","journal-title":"Proceedingsof 6th international conference on advances in power system control operation and management November 2003"},{"key":"ref22","article-title":"Long Term Investment Decision Approach for Electricity Substation Expansion Planning","author":"gallego-preciado","year":"0","journal-title":"Presented at ENERGEX 2006 Stavanger Norway June 2006"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.3844\/ajassp.2009.368.379"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1007\/s00202-006-0039-x"},{"key":"ref23","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/3927.001.0001","author":"mitchell","year":"1998","journal-title":"An Introduction to Genetic Algorithms"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1049\/ip-gtd:19981895","article-title":"Transmission system expansion planning by an extended genetic algorithm","volume":"145","author":"gallego","year":"1998","journal-title":"IEE Proc ener Transm Distrib"}],"event":{"name":"2010 International Congress on Ultra Modern Telecommunications and Control Systems and Workshops (ICUMT 2010)","start":{"date-parts":[[2010,10,18]]},"location":"Moscow, Russia","end":{"date-parts":[[2010,10,20]]}},"container-title":["International Congress on Ultra Modern Telecommunications and Control Systems"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/5655222\/5676472\/05676609.pdf?arnumber=5676609","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,11,16]],"date-time":"2021-11-16T20:16:42Z","timestamp":1637093802000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/5676609\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,10]]},"references-count":25,"URL":"https:\/\/doi.org\/10.1109\/icumt.2010.5676609","relation":{},"subject":[],"published":{"date-parts":[[2010,10]]}}}