{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T04:26:28Z","timestamp":1730262388841,"version":"3.28.0"},"reference-count":14,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,11]]},"DOI":"10.1109\/iecon.2013.6700074","type":"proceedings-article","created":{"date-parts":[[2014,1,6]],"date-time":"2014-01-06T12:14:59Z","timestamp":1389010499000},"page":"5735-5740","source":"Crossref","is-referenced-by-count":1,"title":["Methodology for deploying model based control concepts for load shaping in the non-residential building sector"],"prefix":"10.1109","author":[{"given":"Tarik","family":"Ferhatbegovic","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Stefan","family":"Hauer","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Gerhard","family":"Zucker","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"year":"0","key":"13"},{"key":"14","article-title":"Predictive control vs pid control of an industrial heat exchanger","author":"bonivento","year":"2001","journal-title":"9th Mediterranean Conference on Control and Automation 2001"},{"key":"11","article-title":"Using simulation for optimized building operation","author":"zucker","year":"2010","journal-title":"Proceedings of the E-nova 2010"},{"journal-title":"Energy","year":"2011","key":"12"},{"key":"3","first-page":"1468","volume":"73","author":"gellings","year":"1985","journal-title":"The Concept of Demand-side Management for Electric Utilities"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2011.6019347"},{"key":"1","first-page":"1","article-title":"Demand side management in a highly decentralized energy future","author":"luo","year":"2010","journal-title":"Universities Power Engineering Conference (UPEC) 2010 45th International"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/ISIE.2012.6237203"},{"key":"7","first-page":"141","volume":"33","author":"chen","year":"2001","journal-title":"Real-time Predictive Supervisory Operation of Building Thermal Systems with Thermal Mass"},{"key":"6","first-page":"1","article-title":"Peak demand reduction from pre-cooling with zone temperature reset in an office building","author":"xu","year":"2004","journal-title":"Proceedings of the 2004 ACEEE Summer Study on Energy Efficiency in Buildings"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1115\/1.1592184"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1109\/ETFA.2011.6059103"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/IECON.2012.6388685"},{"key":"8","first-page":"264","author":"braun","year":"1990","journal-title":"Reducing Energy Costs and Peak Electrical Demand Through Optimal Control of Building Thermal Mass"}],"event":{"name":"IECON 2013 - 39th Annual Conference of the IEEE Industrial Electronics Society","start":{"date-parts":[[2013,11,10]]},"location":"Vienna, Austria","end":{"date-parts":[[2013,11,13]]}},"container-title":["IECON 2013 - 39th Annual Conference of the IEEE Industrial Electronics Society"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6683943\/6699103\/06700074.pdf?arnumber=6700074","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,22]],"date-time":"2017-03-22T19:26:27Z","timestamp":1490210787000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6700074\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,11]]},"references-count":14,"URL":"https:\/\/doi.org\/10.1109\/iecon.2013.6700074","relation":{},"subject":[],"published":{"date-parts":[[2013,11]]}}}