{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T04:25:08Z","timestamp":1730262308128,"version":"3.28.0"},"reference-count":27,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,10]]},"DOI":"10.1109\/iecon.2016.7794053","type":"proceedings-article","created":{"date-parts":[[2017,1,5]],"date-time":"2017-01-05T11:47:13Z","timestamp":1483616833000},"page":"66-71","source":"Crossref","is-referenced-by-count":0,"title":["Comparison of performance the neighborhood operators and the ratio of search local-global in minimizing makespan using an GA-VNS collaboration to solve reactive production scheduling"],"prefix":"10.1109","author":[{"given":"Carlos C.M.","family":"Tuma","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Orides","family":"Morandin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vinicius F.","family":"Carida","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2007.06.039"},{"key":"ref11","first-page":"33","article-title":"Tabu search and genetic algorithm for scheduling with total flow time minimization","author":"gonz\u00e1lez","year":"2010","journal-title":"Proceedings of the Workshop on Constraint Satisfaction Techniques for Planning and Scheduling Problems"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMR.590.557"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-011-0520-x"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2011.10.007"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.1.3.190"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.2.1.4"},{"key":"ref17","first-page":"524","author":"arenales","year":"2007","journal-title":"Pesquisa Operacional"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/ICNC.2010.5583652"},{"journal-title":"Adaptation in Natural and Artificial Systems","year":"1975","author":"holland","key":"ref19"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/KES.1998.725963"},{"journal-title":"Local Search in Combinatorial Optimization","year":"2004","author":"aarts","key":"ref27"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2005.11.005"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-004-2345-7"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00645-8"},{"key":"ref8","first-page":"22","author":"sinha","year":"2003","journal-title":"A Survey of Hybrid Genetic and Evolutionary Algorithms"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/ISIE.2008.4677072"},{"key":"ref2","first-page":"247","author":"montevechi","year":"2007","journal-title":"Sistemas de Manufatura In AGUIRRE L A Enciclop&#x00E9;dia de Autom&#x00E1;tics Controle & Automa&#x00E7;&#x00E3;o"},{"key":"ref9","first-page":"592","article-title":"Verification and extension of the theory of global-local hybrids","author":"sinha","year":"2001","journal-title":"Proceedings of the Genetic and Evolutionary Computation Conference"},{"key":"ref1","doi-asserted-by":"crossref","first-page":"601","DOI":"10.1007\/s00170-005-0223-6","article-title":"A Hybrid Multi-Objective GA for Simultaneous Scheduling of Machines and AGVs in FMS","volume":"31","author":"reddy","year":"2006","journal-title":"International Journal Advanced Manufacturing Technology"},{"journal-title":"Uma estrutura de vizinhan&#x00E7;a baseada em &#x00E1;rvore de cobertura aplicada em uma colabora&#x00E7;&#x00E3;o de algoritmo gen&#x00E9;tico e VNS para a minimiza&#x00E7;&#x00E3;o de makespan em problemas de Programa&#x00E7;&#x00E3;o Reativa da Produ&#x00E7;&#x00E3;o","year":"2015","author":"tuma","key":"ref20"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2011.06.031"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1016\/j.future.2009.01.004"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/ICIEEM.2011.6035308"},{"journal-title":"Problem instances","year":"0","author":"taillard","key":"ref23"},{"journal-title":"Planning and Scheduling in Manufacturing and Services","year":"2005","author":"pinedo","key":"ref26"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2008.01.007"}],"event":{"name":"IECON 2016 - 42nd Annual Conference of the IEEE Industrial Electronics Society","start":{"date-parts":[[2016,10,23]]},"location":"Florence","end":{"date-parts":[[2016,10,26]]}},"container-title":["IECON 2016 - 42nd Annual Conference of the IEEE Industrial Electronics Society"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7782522\/7792929\/07794053.pdf?arnumber=7794053","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,1,21]],"date-time":"2020-01-21T09:15:55Z","timestamp":1579598155000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/7794053\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,10]]},"references-count":27,"URL":"https:\/\/doi.org\/10.1109\/iecon.2016.7794053","relation":{},"subject":[],"published":{"date-parts":[[2016,10]]}}}