{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T04:15:20Z","timestamp":1730261720933,"version":"3.28.0"},"reference-count":17,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,10]]},"DOI":"10.1109\/iecon.2017.8217036","type":"proceedings-article","created":{"date-parts":[[2017,12,21]],"date-time":"2017-12-21T22:02:40Z","timestamp":1513893760000},"page":"5974-5979","source":"Crossref","is-referenced-by-count":1,"title":["Retiring strategies of transformer LCC with reliability of power transmission system considered"],"prefix":"10.1109","author":[{"given":"Mingxing","family":"Zhu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Liangyan","family":"Jia","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hao","family":"Hu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jing","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhongchao","family":"Wu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dabo","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yigang","family":"He","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Haifeng","family":"Ye","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"21","article-title":"Selection of Substation Main Transformer Based on Life Cycle Cost","volume":"29","author":"wenjin","year":"2009","journal-title":"Dianli Yu Diangong"},{"key":"ref11","first-page":"80","article-title":"Life Cycle Cost Model And Comprehensive Sensitivity Analysis of Power Transformer","volume":"41","author":"yuqin","year":"2014","journal-title":"Journal of North China Electric Power University"},{"key":"ref12","first-page":"50","article-title":"Transformer Life Cycle Cost model Based on Interval Analysis. ELECTRIC","volume":"31","author":"xiubo","year":"2011","journal-title":"Power Automation Equipment"},{"key":"ref13","first-page":"85","article-title":"Assessment of Failure Rate for Substation Equipment Life Cycle Based on Marquardt Parameter Estimation Method","volume":"40","author":"peng","year":"2012","journal-title":"Power system protection and control"},{"key":"ref14","first-page":"133","article-title":"Replacement and Investment Strategy for Distribution Transforers in Rural Area Based on Life Cycle Cost Theory and Risk Assement","volume":"49","author":"heng","year":"2015","journal-title":"J Xi an Jiaotong University"},{"key":"ref15","volume":"6","author":"sullivan","year":"2007","journal-title":"Engineering Economics"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2003.821434"},{"key":"ref17","article-title":"Maintenance and Replacement Strategies of Electric Power Equipment Based on Condition Monitoring and System Risk Evaluation [D]","author":"dabo","year":"2012","journal-title":"Journal of Chongqing Jianzhu University Chongqing"},{"key":"ref4","first-page":"67","article-title":"Optimal service life evaluation model for in-service equipment based on state linkage","volume":"45","author":"xing","year":"2017","journal-title":"Power system protection and control"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1002\/9780470932117"},{"key":"ref6","first-page":"78","article-title":"Reliability tracing analysis for multi-state power transformers using Bayesian network","volume":"43","author":"wenhui","year":"2015","journal-title":"Power system protection and control"},{"key":"ref5","first-page":"23","article-title":"Research and application on the technology system of plug & play in the smart substation's life cycle","volume":"43","author":"ying","year":"2015","journal-title":"Power system protection and control"},{"key":"ref8","first-page":"111","article-title":"Application of Life Cycle Cost Theory In Main Transformer Selection","volume":"24","author":"wanjing","year":"2012","journal-title":"Proceedings of the CSU-ESPA"},{"key":"ref7","first-page":"69","article-title":"Study of Lcc for Power Transformer In Modification of Transformer Substation","volume":"38","author":"xinqi","year":"2010","journal-title":"Power system protection and control"},{"key":"ref2","article-title":"Methods, and Applications","author":"li","year":"2005","journal-title":"Risk Assessment Of Power Systems Models"},{"journal-title":"Smart Grid Foundation[M]","year":"2010","author":"guangyu","key":"ref1"},{"key":"ref9","first-page":"207","article-title":"Applications of Life Cycle Cost Theory in Decision-Making of Investment for Distribution Transformers Renovation","volume":"35","author":"xiaochu","year":"2011","journal-title":"Power System Technology"}],"event":{"name":"IECON 2017 - 43rd Annual Conference of the IEEE Industrial Electronics Society","start":{"date-parts":[[2017,10,29]]},"location":"Beijing","end":{"date-parts":[[2017,11,1]]}},"container-title":["IECON 2017 - 43rd Annual Conference of the IEEE Industrial Electronics Society"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8168197\/8216002\/08217036.pdf?arnumber=8217036","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,1,23]],"date-time":"2018-01-23T20:37:49Z","timestamp":1516739869000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/8217036\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,10]]},"references-count":17,"URL":"https:\/\/doi.org\/10.1109\/iecon.2017.8217036","relation":{},"subject":[],"published":{"date-parts":[[2017,10]]}}}