{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T06:53:51Z","timestamp":1762498431534,"version":"build-2065373602"},"reference-count":20,"publisher":"IEEE","license":[{"start":{"date-parts":[[2025,10,14]],"date-time":"2025-10-14T00:00:00Z","timestamp":1760400000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2025,10,14]],"date-time":"2025-10-14T00:00:00Z","timestamp":1760400000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2025,10,14]]},"DOI":"10.1109\/iecon58223.2025.11221360","type":"proceedings-article","created":{"date-parts":[[2025,11,6]],"date-time":"2025-11-06T18:48:46Z","timestamp":1762454926000},"page":"1-6","source":"Crossref","is-referenced-by-count":0,"title":["Interoperability of Electrolyzer Systems with Hydrogen Storage for Frequency Regulation"],"prefix":"10.1109","author":[{"given":"Manuel","family":"Agredano-Torres","sequence":"first","affiliation":[{"name":"KTH Royal Institute of Technology,Stockholm,Sweden"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lars","family":"Nordstr\u00f6m","sequence":"additional","affiliation":[{"name":"KTH Royal Institute of Technology,Stockholm,Sweden"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qianwen","family":"Xu","sequence":"additional","affiliation":[{"name":"KTH Royal Institute of Technology,Stockholm,Sweden"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.esr.2022.100934"},{"journal-title":"Fuel Cells and Hydrogen 2 Joint Undertaking","article-title":"Increasing Electric Power System Flexibility: The Role of Industrial Electrification and Green Hydrogen Production","year":"2019","key":"ref2"},{"journal-title":"International Energy Agency IAE","article-title":"Langsiktig marknadsanalys 2021 Scenarier f\u00f6r elsystemets utveckling fram till 2050","year":"2024","key":"ref3"},{"key":"ref4","article-title":"L\u00e5ngsiktig marknadsanalys 2021 Scenarier f\u00f6r elsystemets utveckling fram till 2050","author":"Jonsson","year":"2019","journal-title":"Svenska Kraftn\u00e4t, Sundbyberg, Sweden"},{"journal-title":"Energy Systems Integration Group\u2019s Flexibility Resources Task Force","article-title":"Increasing Electric Power System Flexibility: The Role of Industrial Electrification and Green Hydrogen Production","year":"2022","key":"ref5"},{"key":"ref6","article-title":"Summary of Studies on Rate of Change of Frequency events on the All-Island System","author":"Temtem","year":"2012","journal-title":"EirGrid"},{"journal-title":"AEMO","article-title":"Future Power System Security Program-Progress Report","year":"2016","key":"ref7"},{"journal-title":"ENTSO-E","article-title":"Technical Requirements for Fast Frequency Reserve Provision in the Nordic Synchronous Area-External document","year":"2021","key":"ref8"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2019.1364"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2023.3297985"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2021.3063245"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2022.3181853"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2023.3270295"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2024.3381491"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2025.3528468"},{"journal-title":"Hydrogen Integration into Power Systems Task Force, IEEE Power & Energy Society","article-title":"Interoperability Profile Recommendations for Hydrogen Assets","year":"2024","key":"ref16"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/B978-0-444-62616-5.00008-5"},{"volume-title":"Electrochemical Engineering","year":"2018","author":"Fuller","key":"ref18"},{"journal-title":"Nordic Analysis Group, ENTSO-E","article-title":"Overview of Frequency Control in the Nordic Power System","year":"2024","key":"ref19"},{"journal-title":"ENTSO-E","article-title":"Technical Requirements for Frequency Containment Reserve Provision in the Nordic Synchronous Area","year":"2023","key":"ref20"}],"event":{"name":"IECON 2025 \u2013 51st Annual Conference of the IEEE Industrial Electronics Society","start":{"date-parts":[[2025,10,14]]},"location":"Madrid, Spain","end":{"date-parts":[[2025,10,17]]}},"container-title":["IECON 2025 \u2013 51st Annual Conference of the IEEE Industrial Electronics Society"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/11220977\/11220985\/11221360.pdf?arnumber=11221360","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T06:48:55Z","timestamp":1762498135000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/11221360\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,10,14]]},"references-count":20,"URL":"https:\/\/doi.org\/10.1109\/iecon58223.2025.11221360","relation":{},"subject":[],"published":{"date-parts":[[2025,10,14]]}}}