{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T04:30:37Z","timestamp":1730262637591,"version":"3.28.0"},"reference-count":6,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1109\/ieem.2011.6117896","type":"proceedings-article","created":{"date-parts":[[2012,1,6]],"date-time":"2012-01-06T14:33:46Z","timestamp":1325860426000},"page":"146-150","source":"Crossref","is-referenced-by-count":0,"title":["Evaluation on operation management of cascade hydropower stations"],"prefix":"10.1109","author":[{"given":"Y.","family":"Zheng","sequence":"first","affiliation":[]},{"given":"X. D.","family":"Fu","sequence":"additional","affiliation":[]},{"given":"J. H.","family":"Wei","sequence":"additional","affiliation":[]},{"given":"X.","family":"Li","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"journal-title":"Model Research and System Development of Evaluation on Generation Benefit of the Three Gorges - Gezhouba Cascade Hydropower Stations","year":"2007","author":"cai","key":"3"},{"journal-title":"Standard for Hydrological Information and Hydrological Forecasting (Chinese SL250-2000)","first-page":"18","year":"2000","key":"2"},{"key":"1","first-page":"1","article-title":"Status and Progress of Operation Techniques Integration on Cascade Project of Three Gorges and Gezhouba","volume":"41","author":"dai","year":"2009","journal-title":"Journal of SiChuan University (Engineering Science Edition)"},{"key":"6","first-page":"591","article-title":"Study on Distribution of Flood Forecasting Errors by the Method Based on Maximum Entropy","volume":"38","author":"diao","year":"2007","journal-title":"Journal of Hydraulic Engineering"},{"key":"5","first-page":"3051","article-title":"Performance Evaluation Model for Multipurpose Multireservoir System Operation","author":"geeta","year":"2010","journal-title":"Water Resources Management"},{"key":"4","first-page":"16","article-title":"The Preliminary Study on Evaluation Methods and its Improvement of Economical Operation of Hydropower Station","author":"cao","year":"2008","journal-title":"Three Gorges Construction of China"}],"event":{"name":"2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2011,12,6]]},"location":"Singapore, Singapore","end":{"date-parts":[[2011,12,9]]}},"container-title":["2011 IEEE International Conference on Industrial Engineering and Engineering Management"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6103492\/6117862\/06117896.pdf?arnumber=6117896","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,21]],"date-time":"2017-03-21T13:32:13Z","timestamp":1490103133000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6117896\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,12]]},"references-count":6,"URL":"https:\/\/doi.org\/10.1109\/ieem.2011.6117896","relation":{},"subject":[],"published":{"date-parts":[[2011,12]]}}}