{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T16:20:44Z","timestamp":1729614044548,"version":"3.28.0"},"reference-count":8,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,12]]},"DOI":"10.1109\/ieem.2014.7058676","type":"proceedings-article","created":{"date-parts":[[2015,3,13]],"date-time":"2015-03-13T17:09:19Z","timestamp":1426266559000},"page":"438-442","source":"Crossref","is-referenced-by-count":3,"title":["Multi-objective optimization and risk assessment in system engineering project planning by Ant Colony Algorithm"],"prefix":"10.1109","author":[{"given":"P.","family":"Baroso","sequence":"first","affiliation":[]},{"given":"T.","family":"Coudert","sequence":"additional","affiliation":[]},{"given":"E.","family":"Villeneuve","sequence":"additional","affiliation":[]},{"given":"L.","family":"Geneste","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1007\/1-4020-8151-0_29"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2010.01.019"},{"key":"ref6","doi-asserted-by":"crossref","DOI":"10.1007\/b99492","author":"dorigo","year":"2004","journal-title":"Ant Colony Optimization"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TEVC.2011.2182651"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1023\/B:FODM.0000013074.68765.97"},{"key":"ref7","article-title":"Hybridization of Bayesian networks and belief functions to assess risk. Application to aircraft deconstruction","author":"villeneuve","year":"2011","journal-title":"Int Conf on Industrial Engineering and Systems Management"},{"key":"ref2","first-page":"1089","article-title":"Coupling system design and project planning: discussion on a bijective link between system and project structures","volume":"14","author":"vareilles","year":"2012","journal-title":"ELSEVIER Proceedings of the 14th IFAC Symposium on Information Control Problems in Manufacturing"},{"key":"ref1","article-title":"Proposal for an integrated Case Based Project Planning and system design process","author":"coudert","year":"2011","journal-title":"Proceeedings of the 2nd International Conference en Complex Systems Design & Management CSDM 2011"}],"event":{"name":"2014 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2014,12,9]]},"location":"Selangor Darul Ehsan, Malaysia","end":{"date-parts":[[2014,12,12]]}},"container-title":["2014 IEEE International Conference on Industrial Engineering and Engineering Management"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7048056\/7058583\/07058676.pdf?arnumber=7058676","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,23]],"date-time":"2017-06-23T03:20:08Z","timestamp":1498188008000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7058676\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,12]]},"references-count":8,"URL":"https:\/\/doi.org\/10.1109\/ieem.2014.7058676","relation":{},"subject":[],"published":{"date-parts":[[2014,12]]}}}