{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T04:33:23Z","timestamp":1730262803430,"version":"3.28.0"},"reference-count":15,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,12]]},"DOI":"10.1109\/ieem.2015.7385695","type":"proceedings-article","created":{"date-parts":[[2016,5,7]],"date-time":"2016-05-07T05:44:45Z","timestamp":1462599885000},"page":"489-493","source":"Crossref","is-referenced-by-count":0,"title":["Research on single-level lot-sizing problem under the time-varying environment"],"prefix":"10.1109","author":[{"given":"Jie","family":"Zhang","sequence":"first","affiliation":[]},{"given":"Jianrui","family":"Dong","sequence":"additional","affiliation":[]},{"given":"Yiyong","family":"Xiao","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","first-page":"909","article-title":"A simple forward algorithm to solve general dynamic lot sizing models with n periods in O(n log n) or O(n) time","volume":"8","year":"1991","journal-title":"Management Science"},{"doi-asserted-by":"publisher","key":"ref11","DOI":"10.1109\/ICSMC.2002.1176441"},{"doi-asserted-by":"publisher","key":"ref12","DOI":"10.1109\/FITME.2008.83"},{"doi-asserted-by":"publisher","key":"ref13","DOI":"10.1021\/ie202275y"},{"doi-asserted-by":"publisher","key":"ref14","DOI":"10.1016\/j.omega.2011.12.005"},{"doi-asserted-by":"publisher","key":"ref15","DOI":"10.1287\/mnsc.1040.0262"},{"doi-asserted-by":"publisher","key":"ref4","DOI":"10.1016\/j.omega.2013.03.003"},{"doi-asserted-by":"publisher","key":"ref3","DOI":"10.1016\/j.cor.2011.06.004"},{"key":"ref6","first-page":"6","article-title":"A backlogging model and a multi-echelon model of a dynamic economic lot size production system - a network approach","author":"wi","year":"1969"},{"doi-asserted-by":"publisher","key":"ref5","DOI":"10.1016\/j.ejor.2011.04.015"},{"key":"ref8","first-page":"37","article-title":"Optimal lot-sizing algorithms for complex product structures","volume":"2","year":"1986","journal-title":"Onerations Research"},{"key":"ref7","first-page":"14","article-title":"Dynamic lot size models for multi-stage assembly system","author":"wb","year":"1973","journal-title":"Management Science"},{"year":"1981","author":"rehmani","article-title":"AN INVESTIGATION OF MULTIPLE LEVEL LOT SIZING PROCEDURES IN A MATERIAL REQUIREMENTS PLANNING ENVIRONMENT","key":"ref2"},{"key":"ref1","first-page":"365","article-title":"The capacitated lot sizing problem: a review of models and alzorithms","year":"2003","journal-title":"Omena"},{"key":"ref9","first-page":"89","article-title":"Dynamic version of the economic lot size model","year":"1958","journal-title":"Management Science"}],"event":{"name":"2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2015,12,6]]},"location":"Singapore, Singapore","end":{"date-parts":[[2015,12,9]]}},"container-title":["2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7378213\/7385591\/07385695.pdf?arnumber=7385695","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,24]],"date-time":"2017-03-24T22:46:02Z","timestamp":1490395562000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7385695\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,12]]},"references-count":15,"URL":"https:\/\/doi.org\/10.1109\/ieem.2015.7385695","relation":{},"subject":[],"published":{"date-parts":[[2015,12]]}}}