{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T04:30:15Z","timestamp":1730262615788,"version":"3.28.0"},"reference-count":10,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,12]]},"DOI":"10.1109\/ieem.2018.8607602","type":"proceedings-article","created":{"date-parts":[[2019,1,15]],"date-time":"2019-01-15T10:35:12Z","timestamp":1547548512000},"page":"227-231","source":"Crossref","is-referenced-by-count":2,"title":["ACO-based Parallel Machine Scheduling Considering Both Setup Time and Run-based Preventive Maintenance with Reliability Constraints"],"prefix":"10.1109","author":[{"given":"Siqi","family":"Chen","sequence":"first","affiliation":[]},{"given":"Liya","family":"Wang","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref4","first-page":"1409","article-title":"Integrated uniform machine scheduling with periodic preventive maintenance","volume":"35","author":"jiang","year":"2014","journal-title":"Journal of Harbin Engineering University"},{"key":"ref3","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ijpe.2017.01.014","article-title":"Parallel-machine scheduling with machine-dependent maintenance periodic recycles","volume":"186","author":"guo","year":"2017","journal-title":"International Journal of Production Economics"},{"key":"ref10","first-page":"1398","article-title":"Production scheduling and preventive maintenance integration based on multi-objective optimization","volume":"20","author":"cui","year":"2014","journal-title":"Computer Integrated Manufacturing Systems"},{"journal-title":"Scheduling Theory Algorithms and Systems","year":"2016","author":"pinedo","key":"ref6"},{"key":"ref5","article-title":"Integrated Preventive Maintenance Planning and Production Scheduling on Parallel Machine","volume":"18","author":"huang","year":"2013","journal-title":"Industrial Engineering and Management"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-008-1904-8"},{"key":"ref7","first-page":"1","author":"wang","year":"2003","journal-title":"Theoretical model of ant colony optimization and its applications in production scheduling"},{"key":"ref2","doi-asserted-by":"crossref","first-page":"1764","DOI":"10.1016\/j.cor.2005.05.034","article-title":"Single-machine scheduling with periodic maintenance to minimize makespan","volume":"34","author":"min","year":"2007","journal-title":"Computers & Operations Research"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(01)00197-7"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2014.12.017"}],"event":{"name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2018,12,16]]},"location":"Bangkok","end":{"date-parts":[[2018,12,19]]}},"container-title":["2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8589962\/8607265\/08607602.pdf?arnumber=8607602","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,25]],"date-time":"2022-01-25T22:16:14Z","timestamp":1643148974000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8607602\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12]]},"references-count":10,"URL":"https:\/\/doi.org\/10.1109\/ieem.2018.8607602","relation":{},"subject":[],"published":{"date-parts":[[2018,12]]}}}