{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,25]],"date-time":"2026-06-25T08:18:04Z","timestamp":1782375484243,"version":"3.54.5"},"reference-count":15,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,12]]},"DOI":"10.1109\/ieem.2018.8607605","type":"proceedings-article","created":{"date-parts":[[2019,1,15]],"date-time":"2019-01-15T10:35:12Z","timestamp":1547548512000},"page":"1381-1385","source":"Crossref","is-referenced-by-count":5,"title":["Simulation and Optimization of Production Line in Em-plant based Assembly Workshop"],"prefix":"10.1109","author":[{"given":"H. Y.","family":"Shan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"L. N.","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Y.","family":"Yuan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"C.","family":"Wang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"ref10","first-page":"813","author":"lan","year":"2009","journal-title":"Optimization of Assembly Line Based on Work Study[D]"},{"key":"ref11","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1016\/S0925-5273(99)00057-2","article-title":"An exact method for cost-oriented assembly line balancing[J]","volume":"64","author":"amen","year":"2000","journal-title":"Int J Production Economics"},{"key":"ref12","article-title":"Hybrid Genetic Algorithm for Solving Assembly Line Balancing Problem in Footwear Industry[J]","author":"chen","year":"2014","journal-title":"Advanced Materials Research"},{"key":"ref13","doi-asserted-by":"crossref","DOI":"10.1631\/jzus.A1001436","article-title":"A tree-shaped motion strategy for robustly executing robotic assembly tasks[J]","author":"bota","year":"2010","journal-title":"Journal of Zhejiang University-SCIENCE A (Applied Physics and Engineering)"},{"key":"ref14","doi-asserted-by":"crossref","DOI":"10.1007\/s11771-015-2940-9","article-title":"Optimization of assembly line balancing using genetic algorithm[J]","author":"barathwaj","year":"2015","journal-title":"Journal of Central South University"},{"key":"ref15","article-title":"Accumulated risk of body postures in assembly line balancing problem and modeling through a multi-criteria fuzzy-genetic algorithm[J]","author":"cheshmehgaz","year":"2012","journal-title":"Computers & Industrial Engineering"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.cirpj.2011.02.001"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1002\/hfm.20562"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.878480"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/S0169-8141(02)00091-4"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/S0278-6125(05)80018-4"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.ifacol.2015.06.431"},{"key":"ref2","first-page":"1155","article-title":"Study on Work Improvement in a Packaging Machine Manufacturing Company[C] Industrial Engineering and Engineering Management, 2009","volume":"2009","author":"sun","year":"0","journal-title":"IE&EM '09 16th International Conference on IEEE"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540050204911"},{"key":"ref9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/00207543.2011.578164","article-title":"A heuristic procedure for solving the Lexicographic Bottleneck Assembly Line Balancing Problem (LBALBP)[J]","volume":"50","author":"pastor","year":"2012","journal-title":"International Journal of Production Research"}],"event":{"name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","location":"Bangkok","start":{"date-parts":[[2018,12,16]]},"end":{"date-parts":[[2018,12,19]]}},"container-title":["2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8589962\/8607265\/08607605.pdf?arnumber=8607605","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,26]],"date-time":"2022-01-26T00:10:56Z","timestamp":1643155856000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8607605\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12]]},"references-count":15,"URL":"https:\/\/doi.org\/10.1109\/ieem.2018.8607605","relation":{},"subject":[],"published":{"date-parts":[[2018,12]]}}}