{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T16:58:28Z","timestamp":1772297908799,"version":"3.50.1"},"reference-count":10,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,12]]},"DOI":"10.1109\/ieem.2018.8607607","type":"proceedings-article","created":{"date-parts":[[2019,1,15]],"date-time":"2019-01-15T10:35:12Z","timestamp":1547548512000},"page":"710-714","source":"Crossref","is-referenced-by-count":5,"title":["Reliability Analysis for a Divisional Seru Production System with Stochastic Capacity"],"prefix":"10.1109","author":[{"given":"Xinzi","family":"Han","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhe","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yong","family":"Yin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2011.05.002"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1111\/itor.12014"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1504\/EJIE.2017.083255"},{"key":"ref6","article-title":"Reliability Analysis for a Hybrid Flow Shop with Due Date Consideration","author":"lin","year":"2017","journal-title":"Reliability Engineering and System Safety"},{"key":"ref5","author":"stevenson","year":"2007","journal-title":"Operation Management International Student Edition With Global Readings"},{"key":"ref8","first-page":"160","article-title":"A mathematical model for converting conveyor assembly line to cellular manufacturing","volume":"7","author":"kaku","year":"2008","journal-title":"International Journal of Industrial Engineering and Management Science"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1080\/00207540802275889"},{"key":"ref2","first-page":"27","article-title":"The evolution of seru production systems throughout Canon","volume":"2","author":"yin","year":"2008","journal-title":"Operations Management Education Review"},{"key":"ref9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2016\/8472703","article-title":"Formulations, features of solution space, and algorithms for line-pure seru system conversion","volume":"2016","author":"sun","year":"2016","journal-title":"Math Problems"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1080\/19761597.2010.9668694"}],"event":{"name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","location":"Bangkok","start":{"date-parts":[[2018,12,16]]},"end":{"date-parts":[[2018,12,19]]}},"container-title":["2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8589962\/8607265\/08607607.pdf?arnumber=8607607","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,25]],"date-time":"2022-01-25T22:54:57Z","timestamp":1643151297000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8607607\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12]]},"references-count":10,"URL":"https:\/\/doi.org\/10.1109\/ieem.2018.8607607","relation":{},"subject":[],"published":{"date-parts":[[2018,12]]}}}