{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T19:46:47Z","timestamp":1754164007232,"version":"3.41.2"},"reference-count":27,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,12,1]],"date-time":"2019-12-01T00:00:00Z","timestamp":1575158400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,12,1]],"date-time":"2019-12-01T00:00:00Z","timestamp":1575158400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,12]]},"DOI":"10.1109\/ieem44572.2019.8978558","type":"proceedings-article","created":{"date-parts":[[2020,2,3]],"date-time":"2020-02-03T21:27:12Z","timestamp":1580765232000},"page":"416-420","source":"Crossref","is-referenced-by-count":0,"title":["The Effectiveness of Rolling Stock Maintenance on Quality Assurance at the Largest South African Rail Company"],"prefix":"10.1109","author":[{"given":"S.C.","family":"Mukwakungu","sequence":"first","affiliation":[{"name":"University of Johannesburg,Department of Quality and Operations Management,Johannesburg,South Africa"}]},{"given":"Z.","family":"Sibeko","sequence":"additional","affiliation":[{"name":"University of Johannesburg,Department of Quality and Operations Management,Johannesburg,South Africa"}]},{"given":"C.","family":"Mbohwa","sequence":"additional","affiliation":[{"name":"University of Johannesburg,Department of Quality and Operations Management,Johannesburg,South Africa"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/ICQR2MSE.2011.5976645"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-51502-1_5"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2015.08.016"},{"journal-title":"Condition-Based Maintenance for Effective and Efficient Rolling Stock Capacity Assurance A Study on Heavy Haul Transport in Sweden","year":"2014","author":"palo","key":"ref13"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1080\/21693277.2015.1074124"},{"key":"ref15","article-title":"Maintenance optimization models: a review and analysis","author":"vasili","year":"2011","journal-title":"Proceedings of the International Conference on Industrial Engineering and Operations Management"},{"key":"ref16","first-page":"33","article-title":"Framework for maintenance planning","author":"soares","year":"0","journal-title":"Safety and Reliability of Industrial Products Systems and Structures"},{"journal-title":"Maintenance Fundamentals","year":"2011","author":"mobley","key":"ref17"},{"key":"ref18","first-page":"850","article-title":"TPM and lean maintenance - A critical review","volume":"4","author":"baluch","year":"0","journal-title":"Interdiscplinary Journal of Contemporary Research in Business"},{"key":"ref19","first-page":"4230","article-title":"Development of world class manufacturing framework by using six-sigma, total productive maintenance and lean","volume":"7","author":"okhovat","year":"0","journal-title":"Scientific Research and Essays"},{"journal-title":"Trans","article-title":"Transnet Engineering","year":"0","key":"ref4"},{"journal-title":"Statistical Modelling","year":"2013","author":"kaplan","key":"ref27"},{"journal-title":"Transnet co za","article-title":"About Us - Overview","year":"0","key":"ref3"},{"journal-title":"Reliability-Centered Maintenance","year":"1993","author":"smith","key":"ref6"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/IEEM.2008.4737922"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1287\/trsc.2016.0701"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2010.07.038"},{"journal-title":"Programmatic Procurement A Political Economy Review of the Transnet Freight Rail Competitive Supplier Development Programme","year":"2015","author":"cawe","key":"ref2"},{"journal-title":"A Decision Support Model to Improve Rolling Stock Maintenance Scheduling Based on Reliability and Cost","year":"2014","author":"olumuyiwa","key":"ref9"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.22495\/cocv7i3c4p4"},{"key":"ref20","first-page":"650","article-title":"Lean Maintenance model to reduce scraps and WIP in manufacturing system: Case study in power cables factory","volume":"12","author":"romano","year":"0","journal-title":"WSEAS Transactions on Systems"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-54395-6_53"},{"journal-title":"Lean Maintenance","year":"2004","author":"smith","key":"ref21"},{"journal-title":"First steps in research","year":"2016","author":"maree","key":"ref24"},{"journal-title":"Social Research Methods","year":"2013","author":"bernard","key":"ref23"},{"journal-title":"Practicing research Discovering Evidence That Matters","year":"2008","author":"fink","key":"ref26"},{"journal-title":"Intellectual tools","year":"2003","author":"rossouw","key":"ref25"}],"event":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2019,12,15]]},"location":"Macao, China","end":{"date-parts":[[2019,12,18]]}},"container-title":["2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8961317\/8978490\/08978558.pdf?arnumber=8978558","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,31]],"date-time":"2025-07-31T18:26:00Z","timestamp":1753986360000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8978558\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12]]},"references-count":27,"URL":"https:\/\/doi.org\/10.1109\/ieem44572.2019.8978558","relation":{},"subject":[],"published":{"date-parts":[[2019,12]]}}}