{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,2]],"date-time":"2025-09-02T00:03:57Z","timestamp":1756771437840,"version":"3.44.0"},"reference-count":13,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,12,1]],"date-time":"2019-12-01T00:00:00Z","timestamp":1575158400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,12,1]],"date-time":"2019-12-01T00:00:00Z","timestamp":1575158400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,12]]},"DOI":"10.1109\/ieem44572.2019.8978728","type":"proceedings-article","created":{"date-parts":[[2020,2,3]],"date-time":"2020-02-03T21:27:12Z","timestamp":1580765232000},"page":"855-859","source":"Crossref","is-referenced-by-count":1,"title":["An Integrated Two-Stage Optimization Method for Job-Shop Bottleneck Planning and Scheduling"],"prefix":"10.1109","author":[{"given":"Na","family":"Gao","sequence":"first","affiliation":[{"name":"School of Mechanical and Aerospace Engineering, Nanyang Technological University,Singapore"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Seung Ki","family":"Moon","sequence":"additional","affiliation":[{"name":"School of Mechanical and Aerospace Engineering, Nanyang Technological University,Singapore"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2016.04.006"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.15803\/ijnc.9.2_131"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.05.014"},{"key":"ref13","doi-asserted-by":"crossref","first-page":"6491","DOI":"10.1080\/00207543.2017.1363428","article-title":"An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing","volume":"56","author":"changchun","year":"2018","journal-title":"International Journal of Production Research"},{"key":"ref4","doi-asserted-by":"crossref","first-page":"54","DOI":"10.1016\/j.cie.2018.06.017","article-title":"A scatter simulated annealing algorithm for the bi-objective scheduling problem for the wet station of semiconductor manufacturing","volume":"123","author":"jihong","year":"2018","journal-title":"Computers & Industrial Engineering"},{"key":"ref3","first-page":"208","article-title":"Improved heuristic algorithms for the Job Sequencing and Tool Switching Problem","volume":"88","author":"silva","year":"0","journal-title":"Computers & Operations Research"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"198","DOI":"10.1016\/j.ins.2014.11.036","article-title":"Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems","volume":"298","author":"xiao-ning","year":"2015","journal-title":"Information Sciences"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2014.07.039"},{"key":"ref8","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1016\/j.ins.2014.10.009","article-title":"Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm","volume":"316","author":"jun-qing","year":"2015","journal-title":"Information Sciences"},{"key":"ref7","first-page":"273","article-title":"A modified Genetic Algorithm approach to minimize total weighted tardiness with stochastic rework and reprocessing times","volume":"13","author":"raghavan","year":"2018","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"ref2","first-page":"834","article-title":"Scheduling identical parallel machines with tooling constraints","volume":"257","author":"becz\u00e3o","year":"0","journal-title":"European Journal of Operational Research"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2015.07.040"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-38171-3_2"}],"event":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2019,12,15]]},"location":"Macao, China","end":{"date-parts":[[2019,12,18]]}},"container-title":["2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8961317\/8978490\/08978728.pdf?arnumber=8978728","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,1]],"date-time":"2025-09-01T19:22:24Z","timestamp":1756754544000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8978728\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,12]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/ieem44572.2019.8978728","relation":{},"subject":[],"published":{"date-parts":[[2019,12]]}}}