{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,7]],"date-time":"2025-10-07T12:07:21Z","timestamp":1759838841649,"version":"3.28.0"},"reference-count":23,"publisher":"IEEE","license":[{"start":{"date-parts":[[2022,12,7]],"date-time":"2022-12-07T00:00:00Z","timestamp":1670371200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2022,12,7]],"date-time":"2022-12-07T00:00:00Z","timestamp":1670371200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2022,12,7]]},"DOI":"10.1109\/ieem55944.2022.9989807","type":"proceedings-article","created":{"date-parts":[[2022,12,26]],"date-time":"2022-12-26T19:38:48Z","timestamp":1672083528000},"page":"1488-1492","source":"Crossref","is-referenced-by-count":3,"title":["A Reference Data Model for Material Flow Analysis in the Context of Material Handling System Design and Reconfiguration"],"prefix":"10.1109","author":[{"given":"Zakarya","family":"Soufi","sequence":"first","affiliation":[{"name":"University of Grenoble Alpes, CNRS UMR 5272, G-SCOP Laboratory (Science for Conception, Optimization and Production),Grenoble,France"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Pierre","family":"David","sequence":"additional","affiliation":[{"name":"University of Grenoble Alpes, CNRS UMR 5272, G-SCOP Laboratory (Science for Conception, Optimization and Production),Grenoble,France"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zakaria","family":"Yahouni","sequence":"additional","affiliation":[{"name":"University of Grenoble Alpes, CNRS UMR 5272, G-SCOP Laboratory (Science for Conception, Optimization and Production),Grenoble,France"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2016.03.001"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1080\/09537280600900774"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/IESM.2015.7380198"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1080\/00207549308956714"},{"issue":"5","key":"ref5","article-title":"Material handling","volume":"16","author":"Heragu","year":"2016","journal-title":"Facility design fourth edition"},{"key":"ref6","article-title":"Material Handling and Storage Systems","author":"Shell","year":"2000","journal-title":"Handb. Ind. Autom"},{"key":"ref7","article-title":"Material Handling","author":"Stephens","year":"2013","journal-title":"Manufacturing facilities design and material handling"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/S0890-6955(99)00126-1"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/IDAACS.2005.283081"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.2307\/j.ctv15wxptd"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2012.12.017"},{"key":"ref12","first-page":"440","article-title":"Material Flow Analysis with Software STAN","volume":"2008","author":"Cencic","year":"2008","journal-title":"EnviroInfo 2008 - Environ. Informatics Ind. Ecol"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1108\/13598540810894924"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.envsoft.2006.05.015"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/WSC48552.2020.9383973"},{"article-title":"The Future of Modeling in Material Handling Systems","year":"2010","author":"McGinnis","key":"ref16"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-030-43177-8_5"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.5937\/fmet1504335v"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1080\/23311916.2017.1292864"},{"article-title":"Designing internal logistics systems fit for the future","year":"2013","author":"Granlund","key":"ref20"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2007.02.003"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2018.11.002"},{"issue":"1","key":"ref23","first-page":"53","article-title":"Material Flow Relations in the Design Process of","volume":"10","author":"Telek","year":"2016","journal-title":"Adv. Logist. Syst"}],"event":{"name":"2022 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2022,12,7]]},"location":"Kuala Lumpur, Malaysia","end":{"date-parts":[[2022,12,10]]}},"container-title":["2022 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/9989527\/9989519\/09989807.pdf?arnumber=9989807","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,1]],"date-time":"2024-02-01T08:57:58Z","timestamp":1706777878000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9989807\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,12,7]]},"references-count":23,"URL":"https:\/\/doi.org\/10.1109\/ieem55944.2022.9989807","relation":{},"subject":[],"published":{"date-parts":[[2022,12,7]]}}}