{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,6]],"date-time":"2025-02-06T05:09:31Z","timestamp":1738818571150,"version":"3.37.0"},"reference-count":11,"publisher":"IEEE","license":[{"start":{"date-parts":[[2024,12,15]],"date-time":"2024-12-15T00:00:00Z","timestamp":1734220800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2024,12,15]],"date-time":"2024-12-15T00:00:00Z","timestamp":1734220800000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024,12,15]]},"DOI":"10.1109\/ieem62345.2024.10857039","type":"proceedings-article","created":{"date-parts":[[2025,2,4]],"date-time":"2025-02-04T18:29:33Z","timestamp":1738693773000},"page":"0728-0732","source":"Crossref","is-referenced-by-count":0,"title":["An improved adaptive NSGA-II for multi-objective comprehensive scheduling problem of Flexible Assembly Job Shop"],"prefix":"10.1109","author":[{"given":"H. F.","family":"Yang","sequence":"first","affiliation":[{"name":"Waseda University,Graduate School of Information, Production and Systems,Fukuoka,Japan"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S.","family":"Fujimura","sequence":"additional","affiliation":[{"name":"Waseda University,Japan"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","first-page":"102","article-title":"Research on the green flexible job shop scheduling considering the transportation time of workpieces (in Chinese)","volume":"02","author":"Li","journal-title":"Digital Manufacturing Science"},{"key":"ref2","first-page":"200","article-title":"A hybrid estimation of distribution algorithm for a certain kind of flexible assembly flow shop scheduling problem","volume":"04","author":"Li","journal-title":"Journal of Industrial Engineering and Engineering Management"},{"key":"ref3","first-page":"800","article-title":"Performance analysis of flexible assembly job shop scheduling under variable disturbance intensity","volume":"03","author":"Yang","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1007\/s12293-018-00278-7"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2021.107493"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2020.1836421"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jors.2600793"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-031-36622-2_20"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2021.107455"},{"key":"ref10","first-page":"246","article-title":"Integrated scheduling algorithm of complex product with no-wait constraint based on virtual component","volume":"56","author":"Guo","journal-title":"J. Mech. Eng"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2007.01.001"}],"event":{"name":"2024 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","start":{"date-parts":[[2024,12,15]]},"location":"Bangkok, Thailand","end":{"date-parts":[[2024,12,18]]}},"container-title":["2024 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/10856958\/10856951\/10857039.pdf?arnumber=10857039","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,5]],"date-time":"2025-02-05T06:10:38Z","timestamp":1738735838000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10857039\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,12,15]]},"references-count":11,"URL":"https:\/\/doi.org\/10.1109\/ieem62345.2024.10857039","relation":{},"subject":[],"published":{"date-parts":[[2024,12,15]]}}}