{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,7]],"date-time":"2025-08-07T21:19:15Z","timestamp":1754601555194,"version":"3.30.2"},"reference-count":8,"publisher":"IEEE","license":[{"start":{"date-parts":[[2024,8,18]],"date-time":"2024-08-18T00:00:00Z","timestamp":1723939200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2024,8,18]],"date-time":"2024-08-18T00:00:00Z","timestamp":1723939200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024,8,18]]},"DOI":"10.1109\/indin58382.2024.10774539","type":"proceedings-article","created":{"date-parts":[[2024,12,12]],"date-time":"2024-12-12T19:05:07Z","timestamp":1734030307000},"page":"1-6","source":"Crossref","is-referenced-by-count":1,"title":["An Adaptive Scheduling Method for Infrastructure Construction Progress Based on Digital Twin"],"prefix":"10.1109","author":[{"given":"HaiSheng","family":"Liang","sequence":"first","affiliation":[{"name":"State Grid Shanghai Economic Research Institute, State Grid Shanghai Municipal Electric Power Company,Shanghai,China"}]},{"given":"Yini","family":"Wang","sequence":"additional","affiliation":[{"name":"State Grid Shanghai Economic Research Institute, State Grid Shanghai Municipal Electric Power Company,Shanghai,China"}]},{"given":"Chuxi","family":"Wei","sequence":"additional","affiliation":[{"name":"School of Control And Computer Engineering, North China Electric Power University,Beijing,China"}]},{"given":"Songyuan","family":"Yu","sequence":"additional","affiliation":[{"name":"School of Control And Computer Engineering, North China Electric Power University,Beijing,China"}]},{"given":"Fang","family":"Fang","sequence":"additional","affiliation":[{"name":"School of Control And Computer Engineering, North China Electric Power University,Beijing,China"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000205"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2014.02.018"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1061\/9780784413029.093"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/MSCPES49613.2020.9133695"},{"issue":"7","key":"ref5","first-page":"213","article-title":"Digital twin modeling method for construction process of assembled building","volume":"42","author":"Sheng","year":"2021","journal-title":"Journal of Building Structures"},{"key":"ref6","first-page":"199","volume":"2","author":"Jiamin","year":"2024","journal-title":"Grey-correlation-analysis-based safety risk assessment method for ordinary foundation operations in electric infrastructure construction"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.3390\/s20247006"},{"issue":"21","key":"ref8","first-page":"76","article-title":"Design of electrical main wiring system for nuclear fusion power plant","author":"Hui","year":"2022","journal-title":"Electric Engineering"}],"event":{"name":"2024 IEEE 22nd International Conference on Industrial Informatics (INDIN)","start":{"date-parts":[[2024,8,18]]},"location":"Beijing, China","end":{"date-parts":[[2024,8,20]]}},"container-title":["2024 IEEE 22nd International Conference on Industrial Informatics (INDIN)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/10774078\/10774079\/10774539.pdf?arnumber=10774539","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,12,14]],"date-time":"2024-12-14T06:39:26Z","timestamp":1734158366000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10774539\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,8,18]]},"references-count":8,"URL":"https:\/\/doi.org\/10.1109\/indin58382.2024.10774539","relation":{},"subject":[],"published":{"date-parts":[[2024,8,18]]}}}