{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T07:40:25Z","timestamp":1730274025157,"version":"3.28.0"},"reference-count":34,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,12]]},"DOI":"10.1109\/isgt-asia.2017.8378411","type":"proceedings-article","created":{"date-parts":[[2018,6,11]],"date-time":"2018-06-11T19:06:46Z","timestamp":1528744006000},"page":"1-6","source":"Crossref","is-referenced-by-count":0,"title":["Coordinated generation and transmission planning based on EDA\/DA algorithm considering wind power integration"],"prefix":"10.1109","author":[{"given":"Jinxin","family":"Dong","sequence":"first","affiliation":[]},{"given":"Hui","family":"Han","sequence":"additional","affiliation":[]},{"given":"Xiusheng","family":"Ren","sequence":"additional","affiliation":[]},{"given":"Zheng","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Jiawei","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Haibo","family":"Zhao","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref33","first-page":"19","article-title":"Research of electric network planning with wind power integration considered[J]","volume":"24","year":"2009","journal-title":"Journal of Electric Power Science and Technology"},{"key":"ref32","first-page":"1887","article-title":"A new evalution method for wind power curtailment based on analysis of system regulation capability [J]","volume":"37","author":"lv","year":"2013","journal-title":"Power System Technology"},{"key":"ref31","article-title":"A novel hybrid differential evolution-estimation of distribution algorithm for dynamic optimization proble[C]","author":"song","year":"2013","journal-title":"IEEE Congress on Evolutionary Computation"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2004.06.009"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1109\/TEVC.2006.872133"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2013.0031"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2182363"},{"key":"ref12","first-page":"8","article-title":"Flexible planning of transmission system with large wind farm based on multi-scenario probability) [J]","volume":"29","author":"yuan","year":"2009","journal-title":"Electric Power Automation Equipment"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2013.08.062"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2013.06.027"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2021202"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2012.09.009"},{"key":"ref17","first-page":"21","article-title":"Multi-objective transmission expected value planning considering risk of overloading [J]","volume":"29","author":"wang","year":"2009","journal-title":"Proceedings of the CSEE"},{"key":"ref18","first-page":"28","article-title":"Risk-constrained multistage transmission system expansion planning [J]","volume":"29","author":"yang","year":"2005","journal-title":"Automation of Electronic Power Systems"},{"key":"ref19","first-page":"138","article-title":"A model and algorithm for transmission expansion planning considering the blackout risk [J]","volume":"34","author":"cao","year":"2014","journal-title":"Proceedings of the CSEE"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/S1004-9541(12)60589-8"},{"key":"ref4","first-page":"77","article-title":"Study on impact of wind power integration on power system [J]","volume":"31","author":"chi","year":"2007","journal-title":"Power System Technology"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-1539-5"},{"journal-title":"China Wind Power Development Report 2013 [R]","year":"2013","author":"li","key":"ref3"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"3003","DOI":"10.1109\/TPWRS.2014.2316529","article-title":"Etezadi-Amoli. A multi-objective transmission expansion planning framework in deregulated power systems [J]","volume":"29","author":"ghofrani","year":"2014","journal-title":"IEEE Transactions on Power Systems"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2010.02.015"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2014.2332762"},{"key":"ref8","first-page":"1","article-title":"Generation and transmission coordinating planning associated with wind farms [J]","volume":"36","author":"gao","year":"2012","journal-title":"Automation of Electric Power Systems"},{"key":"ref7","doi-asserted-by":"crossref","first-page":"1911","DOI":"10.1109\/TPWRS.2014.2317590","article-title":"Next generation transmission expansion planning framework: models, tools, and educational opportunities[J]","volume":"29","author":"chakhchoukh","year":"2014","journal-title":"IEEE Transactions on Power Systems"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2012.05.002"},{"key":"ref9","first-page":"66","article-title":"Heuristic optimization algorithm for transmission network expansion planning [J]","volume":"35","author":"zhou","year":"2011","journal-title":"Automation of Electrical Power Systems"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/S0142-0615(00)00042-9"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2012.08.033"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/59.119232"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2011.10.020"},{"key":"ref24","first-page":"1616","article-title":"Large scale transmission network planning using optimization and heuristic techniques[J]","volume":"20","author":"olivera","year":"2005","journal-title":"IEEE Trans Power System"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"402","DOI":"10.1016\/j.ijepes.2012.11.008","article-title":"Transmission expansion planning with AC model based on generalized Benders decomposition[J]","volume":"47","author":"asadamongkol","year":"2013","journal-title":"Electrical Power and Energy Systems"},{"key":"ref26","first-page":"11","article-title":"Application of differential evolution to power systems [J]","volume":"26","author":"qiu","year":"2009","journal-title":"Modern Electric Power"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"398","DOI":"10.1016\/j.ijepes.2014.04.063","article-title":"Multi-objective transmission expansion planning considering multiple generation scenarios[J]","volume":"62","author":"carlos","year":"2014","journal-title":"Electrical Power and Energy Systems"}],"event":{"name":"2017 IEEE Innovative Smart Grid Technologies - Asia (ISGT-Asia)","start":{"date-parts":[[2017,12,4]]},"location":"Auckland","end":{"date-parts":[[2017,12,7]]}},"container-title":["2017 IEEE Innovative Smart Grid Technologies - Asia (ISGT-Asia)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8370759\/8378313\/08378411.pdf?arnumber=8378411","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,11,25]],"date-time":"2019-11-25T20:14:07Z","timestamp":1574712847000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8378411\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,12]]},"references-count":34,"URL":"https:\/\/doi.org\/10.1109\/isgt-asia.2017.8378411","relation":{},"subject":[],"published":{"date-parts":[[2017,12]]}}}