{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T20:19:01Z","timestamp":1725740341672},"reference-count":17,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,9]]},"DOI":"10.1109\/isgt.2016.7781217","type":"proceedings-article","created":{"date-parts":[[2016,12,12]],"date-time":"2016-12-12T20:43:54Z","timestamp":1481575434000},"page":"1-5","source":"Crossref","is-referenced-by-count":1,"title":["Automated transmission expansion and routing incorporating electric and geographic criteria"],"prefix":"10.1109","author":[{"given":"F. B.","family":"Thiam","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"C. L.","family":"DeMarco","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"article-title":"Intrinsic Measures of Power System Network Performance for Transmission Expansion Planning","year":"2015","author":"thiam","key":"ref10"},{"journal-title":"EPRI","article-title":"Survey of Electric and Gas Rights-of-Way Practitioners: Current Practices and Views of Future Transmission Line Siting Issues","year":"0","key":"ref11"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2009.2027490"},{"journal-title":"EPRI","article-title":"EPRI-GTC Overhead Electric Transmission Line Siting Methodology","year":"0","key":"ref13"},{"journal-title":"Kentucky Legislature","article-title":"Siting of Electric Transmission Lines","year":"0","key":"ref14"},{"journal-title":"Kentucky Legislature","article-title":"Siting of Electric Transmission Lines","year":"0","key":"ref15"},{"journal-title":"Kentucky Legislature","article-title":"Siting of Electric Transmission Lines","year":"0","key":"ref16"},{"journal-title":"Kentucky University of Washington Electrical Engineering","article-title":"Power Systems Test Case Archive","year":"0","key":"ref17"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/NAPS.2010.5618969"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/EEEIC.2014.6835899"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2014.05.004"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/NAPS.2014.6965416"},{"journal-title":"FERC","article-title":"FERC Industries - Transmission Line Siting","year":"0","key":"ref8"},{"journal-title":"NERC","article-title":"A Guide to the FERC Electric Transmission Facilities Permit Process","year":"0","key":"ref7"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/PSCE.2006.296340"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2005.12.026"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2008.2008677"}],"event":{"name":"2016 IEEE Power & Energy Society Innovative Smart Grid Technologies Conference (ISGT)","start":{"date-parts":[[2016,9,6]]},"location":"Minneapolis, MN, USA","end":{"date-parts":[[2016,9,9]]}},"container-title":["2016 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7764613\/7781024\/07781217.pdf?arnumber=7781217","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,1,5]],"date-time":"2017-01-05T08:45:32Z","timestamp":1483605932000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7781217\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9]]},"references-count":17,"URL":"https:\/\/doi.org\/10.1109\/isgt.2016.7781217","relation":{},"subject":[],"published":{"date-parts":[[2016,9]]}}}