{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T07:41:56Z","timestamp":1730274116894,"version":"3.28.0"},"reference-count":22,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,9]]},"DOI":"10.1109\/isgt.2016.7781281","type":"proceedings-article","created":{"date-parts":[[2016,12,13]],"date-time":"2016-12-13T01:43:54Z","timestamp":1481593434000},"page":"1-5","source":"Crossref","is-referenced-by-count":3,"title":["Location-allocation of TCSC devices on a power system considering N-1 contingency"],"prefix":"10.1109","author":[{"given":"O.","family":"Ziaee","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"F.","family":"Choobineh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2012.2186594"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/PESGM.2016.7741578"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2002.1007899"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2003.1304359"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2020530"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2015.10.022"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1002\/0470020164"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/S0142-0615(98)00035-0"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.3923\/jas.2009.1677.1685"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/EPC.2008.4763343"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2014.0038"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2106806"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/PESGM.2014.6939777"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2007.907928"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2556424"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2006.03.016"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/59.932292"},{"key":"ref1","first-page":"716","article-title":"Application of pso technique for optimal location of facts devices considering system loadability and cost of installation","volume":"2","author":"saravanan","year":"2005","journal-title":"Power Engineering Conference 2005 IPEC 2005 The 7th International"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/MPER.2001.4311616"},{"journal-title":"Engineering Economics","year":"1986","author":"riggs","key":"ref20"},{"article-title":"Gams, a user's guide","year":"1998","author":"brooke","key":"ref22"},{"article-title":"Network topologies and transmission investment under electric industry restructuring","year":"2006","author":"blumsack","key":"ref21"}],"event":{"name":"2016 IEEE Power & Energy Society Innovative Smart Grid Technologies Conference (ISGT)","start":{"date-parts":[[2016,9,6]]},"location":"Minneapolis, MN, USA","end":{"date-parts":[[2016,9,9]]}},"container-title":["2016 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7764613\/7781024\/07781281.pdf?arnumber=7781281","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,10,3]],"date-time":"2017-10-03T03:58:25Z","timestamp":1507003105000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7781281\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9]]},"references-count":22,"URL":"https:\/\/doi.org\/10.1109\/isgt.2016.7781281","relation":{},"subject":[],"published":{"date-parts":[[2016,9]]}}}