{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T09:26:21Z","timestamp":1725528381180},"reference-count":8,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,12]]},"DOI":"10.1109\/isgteurope.2011.6162730","type":"proceedings-article","created":{"date-parts":[[2012,3,7]],"date-time":"2012-03-07T21:31:03Z","timestamp":1331155863000},"page":"1-8","source":"Crossref","is-referenced-by-count":1,"title":["Advanced control of Hybrid HVAC\/HVDC interconnection interface for the interconnected ENTSO-E - IPS\/UPS systems"],"prefix":"10.1109","author":[{"given":"Lazar","family":"Bizumic","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rachid","family":"Cherkaoui","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fortunato","family":"Villella","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Anna","family":"Arestova","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Andrey","family":"Grobovoy","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ulf","family":"Hager","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"journal-title":"Final Report on the August 14 2003 Blackout in the United States and Canada Causes and Recommendations","year":"2004","key":"3"},{"journal-title":"UCTE Final Report of the Investigation Committee on the 28 September 2003 Blackout in Italy","year":"0","key":"2"},{"journal-title":"UCTE Final Report-system Disturbance on 4 November 2006","year":"0","key":"1"},{"journal-title":"Report on Integration of Large Scale Wind Generation Using HVDC and Power Electronics","year":"2009","key":"7"},{"journal-title":"EURELECTRIC Brussels","article-title":"European, CIS and Mediterranean Interconnection: State of play 2004. 2nd SYSTINT Report","year":"2005","key":"6"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2011.6019385"},{"journal-title":"Feasibility Study Synchronous Interconnection of the IPS\/UPS with the UCTE","year":"2008","key":"4"},{"journal-title":"Fundamentals of Power System Economics","year":"2004","key":"8"}],"event":{"name":"2011 2nd IEEE PES International Conference and Exhibition on \"Innovative Smart Grid Technologies\" (ISGT Europe)","start":{"date-parts":[[2011,12,5]]},"location":"Manchester, United Kingdom","end":{"date-parts":[[2011,12,7]]}},"container-title":["2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6151917\/6162607\/06162730.pdf?arnumber=6162730","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,21]],"date-time":"2017-03-21T15:22:20Z","timestamp":1490109740000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6162730\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,12]]},"references-count":8,"URL":"https:\/\/doi.org\/10.1109\/isgteurope.2011.6162730","relation":{},"subject":[],"published":{"date-parts":[[2011,12]]}}}