{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T22:37:36Z","timestamp":1775083056842,"version":"3.50.1"},"reference-count":16,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,10]]},"DOI":"10.1109\/isgteurope.2012.6465783","type":"proceedings-article","created":{"date-parts":[[2013,3,1]],"date-time":"2013-03-01T08:20:14Z","timestamp":1362126014000},"page":"1-9","source":"Crossref","is-referenced-by-count":14,"title":["PEGASE pan-European test-beds for testing of algorithms on very large scale power systems"],"prefix":"10.1109","author":[{"given":"Fortunato","family":"Villella","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sylvain","family":"Leclerc","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Istvan","family":"Erlich","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Stephane","family":"Rapoport","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"15","doi-asserted-by":"publisher","DOI":"10.1109\/ICECENG.2011.6057656"},{"key":"16","doi-asserted-by":"publisher","DOI":"10.1109\/PESGM.2012.6345508"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1109\/IREP.2010.5563287"},{"key":"14","article-title":"Domain simulation of power systems with different time scales","author":"savcenco","year":"2010","journal-title":"Proceedings of Scientific Computing in Electrical Engineering (SCEE) Conference"},{"key":"11","year":"2007","journal-title":"Final Report on the Disturbances of 4 November 2006 Presentation and Report"},{"key":"12","article-title":"Numerical accelerations for power systems transient stability simulations","author":"pruvost","year":"0","journal-title":"PSCC 2011"},{"key":"3","year":"0","journal-title":"Power systems test case archive"},{"key":"2","year":"0","journal-title":"NEOS Server for Optimization"},{"key":"1","year":"0","journal-title":"FP7 PEGASE Project"},{"key":"10","year":"0","journal-title":"CIGRE Long Term Dynamics Phase II Tech Rep"},{"key":"7","year":"0","journal-title":"PEGASE Deliverables on State Estimation"},{"key":"6","article-title":"Algorithmic requirements for simulation of large network extreme scenarios","year":"0","journal-title":"Deliverable D4 1 of the PEGASE Project"},{"key":"5","author":"anderson","year":"0","journal-title":"Power System Control and Stability"},{"key":"4","year":"0"},{"key":"9","year":"0","journal-title":"PEGASE Deliverables on Time-Domain Simulation"},{"key":"8","year":"0","journal-title":"PEGASE Deliverables on Optimal Power Flow"}],"event":{"name":"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)","location":"Berlin, Germany","start":{"date-parts":[[2012,10,14]]},"end":{"date-parts":[[2012,10,17]]}},"container-title":["2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6450175\/6465601\/06465783.pdf?arnumber=6465783","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,22]],"date-time":"2017-03-22T13:20:14Z","timestamp":1490188814000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6465783\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,10]]},"references-count":16,"URL":"https:\/\/doi.org\/10.1109\/isgteurope.2012.6465783","relation":{},"subject":[],"published":{"date-parts":[[2012,10]]}}}