{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,3]],"date-time":"2025-09-03T11:18:45Z","timestamp":1756898325616,"version":"3.28.0"},"reference-count":16,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,10]]},"DOI":"10.1109\/isgteurope.2012.6465821","type":"proceedings-article","created":{"date-parts":[[2013,3,1]],"date-time":"2013-03-01T13:20:14Z","timestamp":1362144014000},"page":"1-8","source":"Crossref","is-referenced-by-count":7,"title":["Analysis of wind power integration capacity in wind-hydro-thermal hybrid power system"],"prefix":"10.1109","author":[{"given":"Can","family":"Sun","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhaohong","family":"Bie","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Gengfeng","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bowen","family":"Hua","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"15","first-page":"177","volume":"1","author":"chen","year":"2007","journal-title":"Steady-State Analysis of Power System"},{"key":"16","first-page":"152","article-title":"Impact of large-scale wind farm connecting with power grid on peak load regulation demand","volume":"34","author":"zhang","year":"2010","journal-title":"Power System Technology"},{"key":"13","first-page":"145","article-title":"An overview on peak regulation of wind power integrated power systems","author":"bo","year":"0","journal-title":"Proc 2011 Electric Utility Deregulation and Restructuring and Power Technologies (DRPT) Conf"},{"journal-title":"Study on Load-peaking and Optimal Dispatching of Wind Power in the Northwest Power System of China","year":"2009","author":"wei","key":"14"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2004.831707"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2165302"},{"key":"3","first-page":"1698","article-title":"Analysis on peak-regulation operation strategy of hydro-wind power binding system","author":"jing","year":"0","journal-title":"Proc 2011 Electric Utility Deregulation and Restructuring and Power Technologies (DRPT) Conf"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1016\/S0306-2619(02)00045-4"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2004.06.007"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2010.2059053"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2010.2070848"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2007.914180"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2006.889604"},{"key":"4","first-page":"1","article-title":"Power regulation resources required by wind power in Finland and regulation characteristics of power plants","author":"holmgren","year":"0","journal-title":"Proc 2009 Integration of Wide-Scale Renewable Resources into the Power Delivery System Conf"},{"key":"9","first-page":"129","article-title":"A computing method for peak load regulation ability of Northwest China power grid connected with large-scale wind farms","volume":"34","author":"yi","year":"2010","journal-title":"Power System Technology"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2006.881082"}],"event":{"name":"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)","start":{"date-parts":[[2012,10,14]]},"location":"Berlin, Germany","end":{"date-parts":[[2012,10,17]]}},"container-title":["2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6450175\/6465601\/06465821.pdf?arnumber=6465821","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,22]],"date-time":"2017-03-22T17:35:00Z","timestamp":1490204100000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6465821\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,10]]},"references-count":16,"URL":"https:\/\/doi.org\/10.1109\/isgteurope.2012.6465821","relation":{},"subject":[],"published":{"date-parts":[[2012,10]]}}}