{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,23]],"date-time":"2025-08-23T05:10:00Z","timestamp":1755925800926,"version":"3.28.0"},"reference-count":15,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,10]]},"DOI":"10.1109\/isgteurope.2013.6695230","type":"proceedings-article","created":{"date-parts":[[2014,1,6]],"date-time":"2014-01-06T17:12:09Z","timestamp":1389028329000},"page":"1-5","source":"Crossref","is-referenced-by-count":22,"title":["Dynamic cable ratings for smarter grids"],"prefix":"10.1109","author":[{"given":"R.","family":"Huang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J. A.","family":"Pilgrim","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"P. L.","family":"Lewin","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"D.","family":"Payne","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"15","doi-asserted-by":"publisher","DOI":"10.1049\/ip-gtd:19990360"},{"journal-title":"LIBSVM A library for support vector machines","year":"0","author":"chang","key":"13"},{"year":"0","key":"14"},{"journal-title":"Rating of Electric Power Cables-Ampacity Computations for Transmission Distributions and Industrial Applications","year":"1997","author":"anders","key":"11"},{"journal-title":"Electric Cables Calculation of the Current Rating-Part I Current Rating Equations (100% LoadFactor) and Calculations of Losses-Section 1 General","year":"0","key":"12"},{"key":"3","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1049\/pe:19980605","article-title":"auckland central business district supply failure: the ministerial inquiry","volume":"12","author":"leyland","year":"1998","journal-title":"Power Engineering Journal"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1109\/57.793827"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2006.874668"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2008.917648"},{"key":"7","first-page":"41","article-title":"Computer method for the calculation of the response of single-core cables to a step function thermal transient","volume":"87","year":"1983","journal-title":"Electra"},{"key":"6","first-page":"6","article-title":"Real-time monitors and dynamic thermal rating methods","author":"clairmont","year":"2010","journal-title":"EPRI Increased Power Flow Guidebook Electric Power"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/IAS.2002.1042682"},{"journal-title":"Calculation of the Cyclic and Emergency Current Ratings of Cables Part 2 Cyclic Rating Factor of Cables Greater than 18\/30 (36) kV and Emergency Ratings for Cables of All Voltages","first-page":"853","year":"0","key":"4"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2009.2021084"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd:20070142"}],"event":{"name":"2013 4th IEEE\/PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)","start":{"date-parts":[[2013,10,6]]},"location":"Lyngby, Denmark","end":{"date-parts":[[2013,10,9]]}},"container-title":["IEEE PES ISGT Europe 2013"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6683934\/6695228\/06695230.pdf?arnumber=6695230","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,22]],"date-time":"2017-06-22T05:23:41Z","timestamp":1498109021000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6695230\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,10]]},"references-count":15,"URL":"https:\/\/doi.org\/10.1109\/isgteurope.2013.6695230","relation":{},"subject":[],"published":{"date-parts":[[2013,10]]}}}