{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,23]],"date-time":"2026-01-23T09:14:29Z","timestamp":1769159669959,"version":"3.49.0"},"reference-count":28,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,10]]},"DOI":"10.1109\/isgteurope.2018.8571481","type":"proceedings-article","created":{"date-parts":[[2019,1,8]],"date-time":"2019-01-08T22:36:24Z","timestamp":1546986984000},"page":"1-6","source":"Crossref","is-referenced-by-count":19,"title":["Under Frequency Load Shedding based on PMU Estimates of Frequency and ROCOF"],"prefix":"10.1109","author":[{"given":"Asja","family":"Derviskadic","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yihui","family":"Zuo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Guglielmo","family":"Frigo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mario","family":"Paolone","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/AMPS.2017.8078330"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2006.881588"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1979.319407"},{"key":"ref13","first-page":"1","article-title":"IEEE Standard for Synchrophasor Measurements for Power Systems - Amendment 1: Modification of Selected Performance Requirements","year":"2014","journal-title":"IEEE Std C37 118 1a-2014 (Amendment to IEEE Std C37 118 1&#x2013;2011)"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2017.2779378"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2014.2323137"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2015.2450295"},{"key":"ref17","article-title":"AUFLS III - appendix B: Rate-of-change-of-frequency (RoCof) relays bench testing methodology and results","year":"2010","journal-title":"Tech Rep"},{"key":"ref18","article-title":"Rate of change of frequency (ROCOF) withstand capability","year":"2017","journal-title":"Tech Rep"},{"key":"ref19","article-title":"Technical background and recommendations for defence plans in the continental europe synchronous area","year":"0","journal-title":"2010 Technical Report"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2015.7232794"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2010.5589415"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2014.2321463"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2241794"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2014.0106"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2787861"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2008.2002665"},{"key":"ref7","first-page":"1","article-title":"IEEE Standard for Synchrophasor Measurements for Power Systems","year":"2011","journal-title":"IEEE Std C37 118 1-2011 (Revision of IEEE Std C37 118-2005)"},{"key":"ref2","first-page":"1","article-title":"Automatic under-frequency load shedding in New Zealand power system &#x2014; A systematic review","author":"mollah","year":"2011","journal-title":"AUPEC 2011 AUPEC"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/RTUCON.2016.7763110"},{"key":"ref1","first-page":"1","article-title":"IEEE guide for the application of protective relays used for abnormal frequency load shedding and restoration","year":"2007","journal-title":"IEEE Std C37 117&#x2013;2007"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2016.2540723"},{"key":"ref22","doi-asserted-by":"crossref","DOI":"10.1109\/ISGTEurope.2018.8571832","article-title":"Dispatch and primary frequency control with electrochemical storage: a system-wise verification","author":"zuo","year":"2018","journal-title":"2018 IEEE Innovative Smart Grid Technologies - Europe (ISGT Europe)"},{"key":"ref21","year":"2018","journal-title":"EMEGAsim PowerGrid Real-Time Digital Hardware in the Loop Simulator - Opal RT"},{"key":"ref24","article-title":"Analysis of wind generation impact on ercot ancillary services requirements","author":"company","year":"2008","journal-title":"Tech Rep"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/PESC.2004.1355112"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2016.2622725"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.2172\/1004166"}],"event":{"name":"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)","location":"Sarajevo, Bosnia and Herzegovina","start":{"date-parts":[[2018,10,21]]},"end":{"date-parts":[[2018,10,25]]}},"container-title":["2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8540978\/8571395\/08571481.pdf?arnumber=8571481","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,8,24]],"date-time":"2020-08-24T05:18:22Z","timestamp":1598246302000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8571481\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,10]]},"references-count":28,"URL":"https:\/\/doi.org\/10.1109\/isgteurope.2018.8571481","relation":{},"subject":[],"published":{"date-parts":[[2018,10]]}}}