{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,23]],"date-time":"2025-12-23T12:17:09Z","timestamp":1766492229441,"version":"3.44.0"},"reference-count":19,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,9]]},"DOI":"10.1109\/isgteurope.2019.8905603","type":"proceedings-article","created":{"date-parts":[[2019,11,25]],"date-time":"2019-11-25T13:52:22Z","timestamp":1574689942000},"page":"1-5","source":"Crossref","is-referenced-by-count":5,"title":["Greedy Algorithm for Generator Start-Up Sequence Optimization in Power System Restoration Considering Transmission Path"],"prefix":"10.1109","author":[{"given":"Jian","family":"Zhang","sequence":"first","affiliation":[{"name":"State Key Laboratory of Power Systems, Tsinghua University,Dept. of Electrical Engineering,Beijing,China,100084"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dong","family":"Wang","sequence":"additional","affiliation":[{"name":"State Grid Corporation of China,Department of Safety Supervision,Beijing,China,100031"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Changqing","family":"Xu","sequence":"additional","affiliation":[{"name":"Economic and Technological Research Institute, State Grid Henan Electric Power Company Co., Ltd.,Zhengzhou,China,450052"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Changcheng","family":"Li","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Guangxi University,Nanning,China,530004"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ning","family":"Zhang","sequence":"additional","affiliation":[{"name":"State Key Laboratory of Power Systems, Tsinghua University,Dept. of Electrical Engineering,Beijing,China,100084"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"814","article-title":"A multi-objective optimization method for post-blackout unit restoration","volume":"36","author":"zhu","year":"2013","journal-title":"Power System Technology"},{"key":"ref11","first-page":"80g87","article-title":"An optimization strategy for network reconfiguration employing restoration benefits of generating units and comprehensive importance indices of lines","volume":"37","author":"zhang","year":"2013","journal-title":"Automation of Electric Power Systems"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1080\/001075199181549"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2016.2539199"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/ICEET.2009.203"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1007\/BF02124742"},{"key":"ref16","first-page":"329","article-title":"Greedy algorithms","volume":"1","author":"cormen","year":"2001","journal-title":"Introduction to Algorithms"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2010.2099675"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2011.0591"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2013.0065"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/59.466500"},{"journal-title":"Wikipedia the Free Encyclopedia","article-title":"2019 Venezuelan blackout","year":"2019","key":"ref3"},{"key":"ref6","first-page":"1","article-title":"Optimizing the generator startup sequence after a power system blackout","author":"shen","year":"0","journal-title":"2014 IEEE PES General Meeting | Conference &amp; Exposition"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/59.317561"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.3390\/app6120435"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1145\/2739480.2754647"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2018.2820150"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tej.2016.08.006"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2018.07.045"}],"event":{"name":"2019 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe)","start":{"date-parts":[[2019,9,29]]},"location":"Bucharest, Romania","end":{"date-parts":[[2019,10,2]]}},"container-title":["2019 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8892271\/8905428\/08905603.pdf?arnumber=8905603","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,1]],"date-time":"2025-09-01T19:18:55Z","timestamp":1756754335000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8905603\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,9]]},"references-count":19,"URL":"https:\/\/doi.org\/10.1109\/isgteurope.2019.8905603","relation":{},"subject":[],"published":{"date-parts":[[2019,9]]}}}