{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,26]],"date-time":"2026-03-26T15:48:51Z","timestamp":1774540131737,"version":"3.50.1"},"reference-count":40,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T00:00:00Z","timestamp":1698019200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T00:00:00Z","timestamp":1698019200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,10,23]]},"DOI":"10.1109\/isgteurope56780.2023.10407387","type":"proceedings-article","created":{"date-parts":[[2024,1,30]],"date-time":"2024-01-30T13:43:21Z","timestamp":1706622201000},"page":"1-5","source":"Crossref","is-referenced-by-count":4,"title":["On the Definition and Classification of Power System Flexibility"],"prefix":"10.1109","author":[{"given":"Taulant","family":"K\u00ebr\u00e7i","sequence":"first","affiliation":[{"name":"EirGrid plc,Transmission System Operator,Innovation &#x0026; Planning Department,Ireland"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","volume-title":"Power System Stability and Control","author":"Kundur","year":"1994"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.2172\/1130630"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.3390\/en15020516"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2021.107022"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2020.3041774"},{"key":"ref6","volume-title":"Flexibility","year":"2023"},{"key":"ref7","volume-title":"Flexibility needs in the future power system","author":"Hillberg","year":"2019"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2020.115852"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1007\/s40565-019-0527-4"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.egyr.2019.11.048"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.3389\/fenrg.2022.967220"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.3390\/electronics11040581"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2019.2897727"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2022.3185460"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2015.7232514"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2177280"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.jup.2022.101349"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.tej.2017.01.009"},{"key":"ref19","volume-title":"Status of power system transformation 2019 power system flexibility","year":"2019"},{"key":"ref20","volume-title":"ENTSO-E response to the CEER public consultation guidelines of good practice for flexibility use at distribution level","year":"2017"},{"key":"ref21","volume-title":"Renewable integration study stage 1 appendix c: Managing variability and uncertainty","year":"2020"},{"key":"ref22","volume-title":"Introduction to energy system flexibility what is flexibility and why do energy systems need it?","year":"2020"},{"key":"ref23","volume-title":"NIE networks flex webinar","year":"2021"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2015.2390038"},{"key":"ref25","volume-title":"Assessment of future flexibility needs","year":"2021"},{"key":"ref26","volume-title":"Public workshop on scoping of demand side flexibility framework guidelines"},{"key":"ref27","volume-title":"Public consultation on the draft framework guidelines on demand response","year":"2022"},{"key":"ref28","volume-title":"Operational policy roadmap 2023-2030","year":"2022"},{"key":"ref29","volume-title":"Engineering roadmap to 100% renewables","year":"2022"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.tej.2014.10.005"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.4337\/9781789905472"},{"key":"ref32","volume-title":"Flexibility services","year":"2023"},{"key":"ref33","article-title":"Local electricity flexibility markets in Europe","author":"Chondrogiannis","year":"2022"},{"key":"ref34","volume-title":"Flexibility product specification","year":"2021"},{"key":"ref35","volume-title":"Distributed flexibility and the value of TSO\/DSO cooperation","year":"2021"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2022.109002"},{"key":"ref37","volume-title":"Establishing a guideline on electricity transmission system operation","year":"2017"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2022.3188261"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2016364"},{"key":"ref40","volume-title":"Grid and flexibility services: An overview of California ISO","year":"2020"}],"event":{"name":"2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)","location":"Grenoble, France","start":{"date-parts":[[2023,10,23]]},"end":{"date-parts":[[2023,10,26]]}},"container-title":["2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10406304\/10407103\/10407387.pdf?arnumber=10407387","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,13]],"date-time":"2024-03-13T23:39:18Z","timestamp":1710373158000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10407387\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,23]]},"references-count":40,"URL":"https:\/\/doi.org\/10.1109\/isgteurope56780.2023.10407387","relation":{},"subject":[],"published":{"date-parts":[[2023,10,23]]}}}