{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T23:21:12Z","timestamp":1725751272754},"reference-count":26,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T00:00:00Z","timestamp":1698019200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T00:00:00Z","timestamp":1698019200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,10,23]]},"DOI":"10.1109\/isgteurope56780.2023.10408085","type":"proceedings-article","created":{"date-parts":[[2024,1,30]],"date-time":"2024-01-30T18:43:21Z","timestamp":1706640201000},"page":"1-5","source":"Crossref","is-referenced-by-count":0,"title":["A Two-Stage Stochastic Techno-Economic Optimal ESS Sizing Model to Enable Maximum Exploitation of RESs"],"prefix":"10.1109","author":[{"given":"Seyed Masoud","family":"Mohseni-Bonab","sequence":"first","affiliation":[{"name":"Laval University,Digital Systems, Hydro-Quebec Research Institute and with the School of Electrical and Computer Engineering, College of Engineering,QC,Canada"}]},{"given":"Ali","family":"Alizadeh","sequence":"additional","affiliation":[{"name":"Laval University,School of Electrical and Computer Engineering, College of Engineering,QC,Canada"}]},{"given":"Innocent","family":"Kamwa","sequence":"additional","affiliation":[{"name":"Laval University,School of Electrical and Computer Engineering, College of Engineering,QC,Canada"}]},{"given":"Abbas","family":"Rabiee","sequence":"additional","affiliation":[{"name":"University of Zanjan"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2019.06.147"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2017.01.089"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2019.2946371"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2020.115242"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2015.2449076"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.113926"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/B978-0-12-803374-6.00005-6"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2019.105471"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2017.2774732"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2018.06.036"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.2992654"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2020.2977944"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2906876"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2014.04.103"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.2172\/1235905"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2010.2045663"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/EEEIC.2015.7165229"},{"volume-title":"Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below","year":"2020","key":"ref18"},{"key":"ref19","article-title":"Distribution system planning and reliability assessment under high DG penetration","volume-title":"PhD thesis, Electrical and Computer Engineering","author":"Atwa","year":"2010"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2016.2594814"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/61.25627"},{"volume-title":"Fact Sheet: Energy Storage (2019)","year":"2020","key":"ref22"},{"volume-title":"CPLEX Solver","key":"ref23"},{"key":"ref24","article-title":"Lithium-ion Battery Costs and Market","author":"Curry","year":"2017","journal-title":"Bloomberg New Energy Finance"},{"volume-title":"IESO Announces Results of Competitive Bids for Large Renewable Projects","year":"2020","key":"ref25"},{"volume-title":"Canada\u2019s Energy Future 2019","year":"2020","key":"ref26"}],"event":{"name":"2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)","start":{"date-parts":[[2023,10,23]]},"location":"Grenoble, France","end":{"date-parts":[[2023,10,26]]}},"container-title":["2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10406304\/10407103\/10408085.pdf?arnumber=10408085","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,14]],"date-time":"2024-03-14T01:10:00Z","timestamp":1710378600000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10408085\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,23]]},"references-count":26,"URL":"https:\/\/doi.org\/10.1109\/isgteurope56780.2023.10408085","relation":{},"subject":[],"published":{"date-parts":[[2023,10,23]]}}}