{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,20]],"date-time":"2026-01-20T17:32:26Z","timestamp":1768930346363,"version":"3.49.0"},"reference-count":25,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T00:00:00Z","timestamp":1698019200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,10,23]],"date-time":"2023-10-23T00:00:00Z","timestamp":1698019200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,10,23]]},"DOI":"10.1109\/isgteurope56780.2023.10408146","type":"proceedings-article","created":{"date-parts":[[2024,1,30]],"date-time":"2024-01-30T18:43:21Z","timestamp":1706640201000},"page":"1-6","source":"Crossref","is-referenced-by-count":1,"title":["Powering Europe\u2019s Energy Transition: Financial Viability of a Full-Scale Meshed HVDC Grid and Hybrid Offshore Assets in the North Sea"],"prefix":"10.1109","author":[{"given":"Chandra Kant","family":"Jat","sequence":"first","affiliation":[{"name":"KU Leuven\/EnergyVille,Leuven\/Genk,Belgium"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Stephen","family":"Hardy","sequence":"additional","affiliation":[{"name":"KU Leuven\/EnergyVille,Leuven\/Genk,Belgium"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jay","family":"Dave","sequence":"additional","affiliation":[{"name":"Power Technology International Group, Siemens AG,Erlangen,Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hakan","family":"Ergun","sequence":"additional","affiliation":[{"name":"KU Leuven\/EnergyVille,Leuven\/Genk,Belgium"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Dirk","family":"Van Hertem","sequence":"additional","affiliation":[{"name":"KU Leuven\/EnergyVille,Leuven\/Genk,Belgium"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/JPROC.2013.2241375"},{"key":"ref2","volume-title":"European Wind Energy Association, EU Energy Policy to 2050 Achieving 80-95% emissions reductions","year":"2011"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2010.07.068"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2012.01.066"},{"key":"ref5","article-title":"Technical aspects of the North Sea super grid","author":"Vrana","year":"2011","journal-title":"CIGRE Electra"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1002\/9781119115243"},{"key":"ref7","volume-title":"PROMOTioN Work package 1, Deliverable 1.3: Synthesis of available studies on offshore meshed hvdc grids, Tech. rep","year":"2020"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1002\/wene.296"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/SEST50973.2021.9543382"},{"key":"ref10","volume-title":"ENTSO-E, TYNDP 2018 - scenario report","year":"2018"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2022.108725"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2936682"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2267058"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2021.3071385"},{"key":"ref15","volume-title":"European Commission, Hybrid projects, how to reduce costs and space of offshore development: North seas offshore energy clusters study, Tech. rep","year":"2019"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2016.01.112"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2014.2332762"},{"key":"ref18","article-title":"Probabilistic optimization of T&D systems planning with high grid flexibility and its scalability D1.2","volume-title":"Tech. rep., FlexPlan","author":"Ergun","year":"2021"},{"key":"ref19","volume-title":"ABB, Hvdc light cables, submarine and land power cables, Tech. rep","year":"2006"},{"key":"ref20","volume-title":"DNV GL, PROMOTioN cost data collection report [internal document]","year":"2020"},{"key":"ref21","volume-title":"Global Offshore Renewable Map 4c offshore","year":"2021"},{"key":"ref22","article-title":"Offshore transmission benchmarking and cost monitoring, Tech. rep","volume-title":"Catapult Offshore Renewable Energy","author":"Smart","year":"2016"},{"key":"ref23","volume-title":"Energinet, Viking Link: 1400 MW high voltage direct current (DC) electricity link between the British and Danish transmission systems"},{"key":"ref24","volume-title":"NeuConnect, NeuConnect Interconnector: The first direct power link between Germany and Great Britain"},{"key":"ref25","volume-title":"ENTSO-E, TR 335 - North Sea Wind Power Hub"}],"event":{"name":"2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)","location":"Grenoble, France","start":{"date-parts":[[2023,10,23]]},"end":{"date-parts":[[2023,10,26]]}},"container-title":["2023 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10406304\/10407103\/10408146.pdf?arnumber=10408146","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,3]],"date-time":"2024-03-03T08:18:10Z","timestamp":1709453890000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10408146\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,23]]},"references-count":25,"URL":"https:\/\/doi.org\/10.1109\/isgteurope56780.2023.10408146","relation":{},"subject":[],"published":{"date-parts":[[2023,10,23]]}}}