{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,31]],"date-time":"2025-12-31T12:09:58Z","timestamp":1767182998460,"version":"3.37.0"},"reference-count":17,"publisher":"IEEE","license":[{"start":{"date-parts":[[2024,10,14]],"date-time":"2024-10-14T00:00:00Z","timestamp":1728864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2024,10,14]],"date-time":"2024-10-14T00:00:00Z","timestamp":1728864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024,10,14]]},"DOI":"10.1109\/isgteurope62998.2024.10863326","type":"proceedings-article","created":{"date-parts":[[2025,2,11]],"date-time":"2025-02-11T18:19:23Z","timestamp":1739297963000},"page":"1-5","source":"Crossref","is-referenced-by-count":1,"title":["Reactive Power Retrieval at the TSO-DSO Interface in Germany: Identifying Approaches and Challenges"],"prefix":"10.1109","author":[{"given":"Nadja Isabelle","family":"Belz","sequence":"first","affiliation":[{"name":"Technische Universit&#x00E4;t Ilmenau,Power Systems Group,Germany"}]},{"given":"Steffen","family":"Schlegel","sequence":"additional","affiliation":[{"name":"Technische Universit&#x00E4;t Ilmenau,Power Systems Group,Germany"}]},{"given":"Jannes","family":"Gr\u00fcnberg","sequence":"additional","affiliation":[{"name":"Technische Universit&#x00E4;t Ilmenau,Power Systems Group,Germany"}]},{"given":"Dirk","family":"Westermann","sequence":"additional","affiliation":[{"name":"Technische Universit&#x00E4;t Ilmenau,Power Systems Group,Germany"}]}],"member":"263","reference":[{"year":"2021","key":"ref1","article-title":"Deutsches Grenzwertkonzept: Regeln zur Ermittlung und \u00dcberwachung von Grenzwerten f\u00fcr die Systemf\u00fchrung des deutschen \u00dcbertragungsnetzes"},{"year":"2023","key":"ref2","article-title":"Redispatch in Deutschland. Auswertung der Transparenzdaten April 2013 bis einschlie\u00dflich Dezember 2022"},{"journal-title":"Technical requirements for the connection and operation of customer installations to the high voltage network (TAR high voltage), VDE-AR-N 4101, VDE FNN","key":"ref3"},{"volume-title":"Directive (EU) 2019\/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market for electricity and amending Directive 2012\/27\/EU: (EU) 2019\/944","year":"2019","key":"ref4"},{"year":"2023","key":"ref5","article-title":"Entwurf eines Konzeptes f\u00fcr die Spezifikationen und technischen Anforderungen der transparenten, diskriminierungsfreien und marktgest\u00fctzten Beschaffung der nicht frequenzgebundenen Systemdienstleistung \u201eDienstleistungen zur Spannungsregelung\" (\u201eBlindleistung\") gem. \u00a7 12h Abs.1 S. 1 Nr. 1, Abs. 5 EnWG"},{"key":"ref6","first-page":"1","article-title":"Harnessing of Reactive Power Supply from the Distribution System","volume-title":"ETG Congress 2023","volume":"2023","author":"Hiersemann"},{"key":"ref7","first-page":"1","article-title":"Closed Loop Assessment of Curative Actions in a Power System Control Center Demonstrator","volume-title":"ETG Congress 2021","author":"Sennewald"},{"key":"ref8","article-title":"Experiences and lessons learned from the Redispatch 2.0 pilot operation at the interface between DSO and TSO","volume-title":"ETG Congress 2023","volume":"2023","author":"Brosinsky"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.3390\/en13133442"},{"key":"ref10","first-page":"1709","article-title":"Robust determination of reactive power potentials from subordinate networks in close-to-real-time operation","volume-title":"27th International Conference on Electricity Distribution (CIRED 2023)","author":"Sennewald"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.3390\/en11010173"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/s1474-6670(17)34441-5"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.segan.2020.100333"},{"volume-title":"Abschlusspapier Task Force Rahmenbedingungen Redispatch 2.0","year":"2023","key":"ref14"},{"author":"Lukaschik","key":"ref15","article-title":"InnoSys 2030 - Abschlussbericht"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/tpas.1979.319407"},{"year":"2021","key":"ref17","article-title":"Beschluss BK6-20-060"}],"event":{"name":"2024 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)","start":{"date-parts":[[2024,10,14]]},"location":"Dubrovnik, Croatia","end":{"date-parts":[[2024,10,17]]}},"container-title":["2024 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/10861900\/10861888\/10863326.pdf?arnumber=10863326","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,12]],"date-time":"2025-02-12T06:40:22Z","timestamp":1739342422000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10863326\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,10,14]]},"references-count":17,"URL":"https:\/\/doi.org\/10.1109\/isgteurope62998.2024.10863326","relation":{},"subject":[],"published":{"date-parts":[[2024,10,14]]}}}