{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,11]],"date-time":"2026-03-11T16:37:25Z","timestamp":1773247045443,"version":"3.50.1"},"reference-count":20,"publisher":"IEEE","license":[{"start":{"date-parts":[[2024,10,14]],"date-time":"2024-10-14T00:00:00Z","timestamp":1728864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2024,10,14]],"date-time":"2024-10-14T00:00:00Z","timestamp":1728864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024,10,14]]},"DOI":"10.1109\/isgteurope62998.2024.10863510","type":"proceedings-article","created":{"date-parts":[[2025,2,11]],"date-time":"2025-02-11T18:19:23Z","timestamp":1739297963000},"page":"1-5","source":"Crossref","is-referenced-by-count":1,"title":["Development of an Instantaneous Reserve Market and Storage Park Based on Inertia Safety Levels"],"prefix":"10.1109","author":[{"given":"Christoph","family":"Sauer","sequence":"first","affiliation":[{"name":"Otto von Guericke University,Institute of Electric Power Systems,Magdeburg,Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Christian","family":"Rinne","sequence":"additional","affiliation":[{"name":"Otto von Guericke University,Institute of Electric Power Systems,Magdeburg,Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Martin","family":"Wolter","sequence":"additional","affiliation":[{"name":"Otto von Guericke University,Institute of Electric Power Systems,Magdeburg,Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.3390\/en13071588"},{"key":"ref2","article-title":"Inertia Certificates - Bedeutung und Wert von Momentanreserve f\u00fcr den Verbundnetzbetrieb","volume-title":"10. Internationale Energiewirtschaftstagung (IEWT)","author":"Gawlik"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/PESGM.2017.8273824"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2018.5263"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.3390\/app12168364"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2020.2981862"},{"key":"ref7","volume-title":"Inertia Spot Market Rule Change Request","year":"2021"},{"key":"ref8","article-title":"Aktuelle Einheiten\u00fcbersicht","year":"2023"},{"key":"ref9","volume-title":"Merit Order Tool - Dokumentation","year":"2022"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TCYB.2016.2526683"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1049\/cp.2012.2036"},{"key":"ref12","article-title":"Methode zur einfachen Absch\u00e4tzung der maximalen Frequenzabweichung bei Lastspr\u00fcngen in Inselnetzen","volume-title":"15. Symposium Energieinnovation","author":"Gratzka"},{"key":"ref13","volume-title":"Rate of Change of Frequency (RoCoF) withstand capability: ENTSO-E guidance document for national implementation for network codes on grid connection","year":"2018"},{"key":"ref14","article-title":"A Literature Review on the Net Present Value (NPV) Valuation Method","volume":"219","author":"Shou","year":"2019","journal-title":"Advances in Economics, Business and Management Research"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1007\/s00202-018-0739-z"},{"key":"ref16","volume-title":"Stromgestehungskosten Erneuerbare Energien","author":"Kost","year":"2021"},{"key":"ref17","article-title":"Future energy storage trends: An assessment of the economic viability, potential uptake and impacts of electrical energy storage on the nem 2015\u20132035","author":"Brinsmead","year":"2015"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2019.2896346"},{"key":"ref19","volume-title":"Szenariorahmen zum Netzentwicklungsplan Strom 2037 mit Ausblick 2045, Version 2023: Entwurf der \u00dcbertragungsnetzbetreiber","year":"2023"},{"key":"ref20","article-title":"smard - Installierte Erzeugungsleistung","year":"2023"}],"event":{"name":"2024 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)","location":"Dubrovnik, Croatia","start":{"date-parts":[[2024,10,14]]},"end":{"date-parts":[[2024,10,17]]}},"container-title":["2024 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/10861900\/10861888\/10863510.pdf?arnumber=10863510","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,12]],"date-time":"2025-02-12T06:59:28Z","timestamp":1739343568000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10863510\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,10,14]]},"references-count":20,"URL":"https:\/\/doi.org\/10.1109\/isgteurope62998.2024.10863510","relation":{},"subject":[],"published":{"date-parts":[[2024,10,14]]}}}