{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T07:46:28Z","timestamp":1730274388002,"version":"3.28.0"},"reference-count":25,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,5]]},"DOI":"10.1109\/isie.2013.6563788","type":"proceedings-article","created":{"date-parts":[[2013,7,25]],"date-time":"2013-07-25T21:06:15Z","timestamp":1374786375000},"page":"1-6","source":"Crossref","is-referenced-by-count":0,"title":["PSO in 2D-space to solve reactive scheduling problems in FMS to reduce the makespan"],"prefix":"10.1109","author":[{"given":"Orides","family":"Morandin","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carlos C. M.","family":"Tuma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vinicius F.","family":"Carida","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Emerson C.","family":"Pedrino","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Roberto H.","family":"Tsunaki","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"19","doi-asserted-by":"publisher","DOI":"10.1109\/ICNN.1995.488968"},{"journal-title":"Uma Heuri?stica Para A Programac?a?o da Produc?a?o de Sistemas Flexi?veis de Manufatura Usando Modelagem em Redes de Petri","year":"2005","author":"maggio","key":"17"},{"key":"18","doi-asserted-by":"publisher","DOI":"10.1109\/ICSMC.2009.5346695"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1007\/BF02729112"},{"key":"16","doi-asserted-by":"publisher","DOI":"10.1109\/RAMECH.2004.1438072"},{"journal-title":"Scheduling and Control of Manufacturing Systems with Critical Material Handling","year":"1989","author":"taghaboni","key":"13"},{"key":"14","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(96)00061-5"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-004-2223-3"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2005.04.009"},{"key":"21","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3766-8"},{"key":"20","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3442-z"},{"key":"22","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-29353-5_32"},{"key":"23","first-page":"977","article-title":"Solving permutation flow shop scheduling problem with a cooperative multi-swarm pso algorithm","volume":"9","author":"li","year":"2012","journal-title":"Journal of Information and Computational Science"},{"key":"24","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-012-4037-z"},{"key":"25","doi-asserted-by":"publisher","DOI":"10.1109\/IECON.2010.5675494"},{"journal-title":"Administrac?a?o de Produc?a?o","year":"2002","author":"slack","key":"3"},{"key":"2","first-page":"247","author":"montevechi","year":"2007","journal-title":"Sistemas de Manufatura In AGUIRRE L A Enciclope?dia de Automa?tica Controle & Automac?a?o"},{"key":"10","article-title":"A genetic algorithm based approach to flowshop scheduling","author":"yin","year":"2004","journal-title":"Proceedings of the 5\" World Congress on Intelligent Control and Automation"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-005-0223-6"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-004-2345-7"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00645-8"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/KES.1998.725963"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2005.11.005"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/ISIE.2008.4677072"},{"journal-title":"Um Me?todo de Busca Usando Algoritmo Gene?tico Para Programac?a?o Reativa da Produc?a?o de Sistemas de Manufatura Com Recursos Compartilhados","year":"2007","author":"deriz","key":"8"}],"event":{"name":"2013 IEEE 22nd International Symposium on Industrial Electronics (ISIE)","start":{"date-parts":[[2013,5,28]]},"location":"Taipei, Taiwan","end":{"date-parts":[[2013,5,31]]}},"container-title":["2013 IEEE International Symposium on Industrial Electronics"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6554304\/6563588\/06563788.pdf?arnumber=6563788","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,22]],"date-time":"2017-03-22T21:41:09Z","timestamp":1490218869000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6563788\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,5]]},"references-count":25,"URL":"https:\/\/doi.org\/10.1109\/isie.2013.6563788","relation":{},"subject":[],"published":{"date-parts":[[2013,5]]}}}