{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,30]],"date-time":"2024-10-30T07:49:53Z","timestamp":1730274593291,"version":"3.28.0"},"reference-count":19,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,6]]},"DOI":"10.1109\/isie.2017.8001240","type":"proceedings-article","created":{"date-parts":[[2017,8,9]],"date-time":"2017-08-09T16:27:37Z","timestamp":1502296057000},"page":"158-162","source":"Crossref","is-referenced-by-count":1,"title":["Study on operating performance of transformer and scaling model with DC bias"],"prefix":"10.1109","author":[{"given":"Jiantao","family":"Sun","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jinzhong","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ke","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chao","family":"Wu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuzhou","family":"Qiu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xinru","family":"Yu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"8","article-title":"DC currents distribution in HVDC systems of monopolar operation with ground return in complex soil structure[J]","volume":"27","author":"qu","year":"2007","journal-title":"Proceedings of the CSEE"},{"key":"ref11","first-page":"69","article-title":"Computation of exciting current and harmonic for three-phase and three limbs transformer under DC inrushing[J]","volume":"32","author":"xiaoping","year":"2006","journal-title":"High Voltage Engineering"},{"key":"ref12","first-page":"71","article-title":"Research on the withstand performance of three-phase three-limb power transformer under DC current biasing[J]","volume":"33","author":"lin","year":"2007","journal-title":"High Voltage Engineering"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/61.296304"},{"key":"ref14","first-page":"127","article-title":"DC bias computation study on three-phase five limbs transformer[J]","volume":"30","author":"xiaoping","year":"2010","journal-title":"Proceedings of the CSEE"},{"key":"ref15","first-page":"3112","article-title":"Analysis on the withstanding ability of power transformers to DC bias under power quality constraints[J]","volume":"36","author":"changyun","year":"2010","journal-title":"High Voltage Engineering"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/DRPT.2011.5994199"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/61.216881"},{"key":"ref18","first-page":"31","article-title":"Three dimensional field analysis of single-phase three-limb power transformer under direct current bias[J]","volume":"44","author":"mansheng","year":"2007","journal-title":"Transformer"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/61.568248"},{"key":"ref4","first-page":"18","article-title":"UHV DC transmission theory [M]","author":"zhengy","year":"2009","journal-title":"Beijing"},{"key":"ref3","first-page":"194","article-title":"The test of secondary control system of the second &#x00B1;500 kV HVDC project from the Three Gorges to Shanghai[J]","volume":"32","author":"tiemin","year":"2011","journal-title":"Power & Energy"},{"key":"ref6","first-page":"26","article-title":"Impact of soil structure adjacent to ground electrodes of UHVDC power transmission lines on DC bias of power transformers[J]","volume":"36","author":"yongming","year":"2012","journal-title":"Power System Technology"},{"key":"ref5","first-page":"22","article-title":"Study on sharing earth electrode by rectifiers or inverters of some UHVDC systems[J]","volume":"31","author":"yiying","year":"2007","journal-title":"Power System Technology"},{"key":"ref8","first-page":"9","article-title":"Analysis on influence of ground electrode current in HVDC on AC power network[J]","volume":"29","author":"mingxin","year":"2005","journal-title":"Power System Technology"},{"key":"ref7","first-page":"33","article-title":"Analysis and reformation on DC bias in main transformer of Guohua Taishan power plant[J]","volume":"33","author":"li","year":"2009","journal-title":"Power System Technology"},{"key":"ref2","first-page":"2173","article-title":"Analysis on lightning withstand performance of the Sanhu &#x00B1;500 kV double circuit HVDC power transmission line[J]","volume":"36","author":"jin","year":"2010","journal-title":"High Voltage Engineering"},{"key":"ref1","first-page":"5","article-title":"Summary of trial test of Three Gorges-Shanghai &#x00B1;500 kV HVDC transmission project[J]","volume":"28","author":"wankai","year":"2007","journal-title":"Electric Power Construction"},{"key":"ref9","first-page":"33","article-title":"Test and simulation for single-phase transformer under DC bias[J]","volume":"27","author":"xiaoping","year":"2007","journal-title":"Proceedings of the CSEE"}],"event":{"name":"2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)","start":{"date-parts":[[2017,6,19]]},"location":"Edinburgh, United Kingdom","end":{"date-parts":[[2017,6,21]]}},"container-title":["2017 IEEE 26th International Symposium on Industrial Electronics (ISIE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7994774\/8000791\/08001240.pdf?arnumber=8001240","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,8,23]],"date-time":"2017-08-23T19:44:53Z","timestamp":1503517493000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/8001240\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,6]]},"references-count":19,"URL":"https:\/\/doi.org\/10.1109\/isie.2017.8001240","relation":{},"subject":[],"published":{"date-parts":[[2017,6]]}}}