{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T17:06:11Z","timestamp":1725728771705},"reference-count":24,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,11,28]],"date-time":"2023-11-28T00:00:00Z","timestamp":1701129600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,11,28]],"date-time":"2023-11-28T00:00:00Z","timestamp":1701129600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,11,28]]},"DOI":"10.1109\/ispec58282.2023.10402931","type":"proceedings-article","created":{"date-parts":[[2024,1,25]],"date-time":"2024-01-25T18:26:03Z","timestamp":1706207163000},"page":"1-7","source":"Crossref","is-referenced-by-count":0,"title":["Reliability-Aware High-Voltage Distribution Network Reconfiguration"],"prefix":"10.1109","author":[{"given":"Fengchao","family":"Chen","sequence":"first","affiliation":[{"name":"Dongguan Power Supply Bureau,Guangdong,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yipeng","family":"He","sequence":"additional","affiliation":[{"name":"Dongguan Power Supply Bureau,Guangdong,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Huan","family":"Rao","sequence":"additional","affiliation":[{"name":"Dongguan Power Supply Bureau,Guangdong,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rui","family":"Zhang","sequence":"additional","affiliation":[{"name":"Dongguan Power Supply Bureau,Guangdong,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Su","family":"Xin","sequence":"additional","affiliation":[{"name":"Chongqing University,State Key Laboratory of Power Transmission Equipment &#x0026; System Security and New Technology,Chongqing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wei","family":"Yan","sequence":"additional","affiliation":[{"name":"Chongqing University,State Key Laboratory of Power Transmission Equipment &#x0026; System Security and New Technology,Chongqing,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chao","family":"Lei","sequence":"additional","affiliation":[{"name":"The Hong Kong Polytechnic University,Department of Electrical and Electronic Engineering,Hong Kong,China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2019.2959586"},{"volume-title":"General planning principles of high voltage distribution networks including wind power","year":"2012","author":"Laaja","key":"ref2"},{"key":"ref3","first-page":"1","article-title":"IEEE Draft Guide for Overhead AC Transmission Line Design","year":"2019","journal-title":"IEEE P1863\/D10"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2021.3106709"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2960297"},{"key":"ref6","first-page":"26","article-title":"Distributed Generation in Europe \u2013 Physical Infrastructure and Distributed Generation Connection","year":"2011","journal-title":"KEMA, Inc."},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1007\/s12667-016-0195-7"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2016.2594385"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/61.974205"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2012.2184307"},{"article-title":"Enforcing radiality constraints for der-aided power distribution grid reconfiguration","volume-title":"arXiv preprint arXiv:1910.03020","author":"Singh","key":"ref11"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2180406"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2023.3304132"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2023.3238035"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/61.25627"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2015.12.023"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2015.2425801"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2019.2917536"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/ENERGYCon48941.2020.9236545"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2022.3153552"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2004.841231"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2015.0558"},{"volume-title":"MOSEK Aps Website","key":"ref23"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2015.2504419"}],"event":{"name":"2023 IEEE Sustainable Power and Energy Conference (iSPEC)","start":{"date-parts":[[2023,11,28]]},"location":"Chongqing, China","end":{"date-parts":[[2023,11,30]]}},"container-title":["2023 IEEE Sustainable Power and Energy Conference (iSPEC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10402601\/10402797\/10402931.pdf?arnumber=10402931","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,3]],"date-time":"2024-03-03T08:01:32Z","timestamp":1709452892000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10402931\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,11,28]]},"references-count":24,"URL":"https:\/\/doi.org\/10.1109\/ispec58282.2023.10402931","relation":{},"subject":[],"published":{"date-parts":[[2023,11,28]]}}}