{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,7]],"date-time":"2026-10-07T17:02:06Z","timestamp":1791392526104,"version":"4.3.3"},"reference-count":43,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","issue":"11","license":[{"start":{"date-parts":[[2005,11,1]],"date-time":"2005-11-01T00:00:00Z","timestamp":1130803200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Proc. IEEE"],"published-print":{"date-parts":[[2005,11]]},"DOI":"10.1109\/jproc.2005.857486","type":"journal-article","created":{"date-parts":[[2006,3,15]],"date-time":"2006-03-15T21:13:13Z","timestamp":1142457193000},"page":"1942-1955","source":"Crossref","is-referenced-by-count":182,"title":["Blackout Prevention in the United States, Europe, and Russia"],"prefix":"10.1109","volume":"93","author":[{"given":"Y.V.","family":"Makarov","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"V.I.","family":"Reshetov","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"A.","family":"Stroev","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"I.","family":"Voropai","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"ref39","year":"2004","journal-title":"NERC Operating Manual"},{"key":"ref38","author":"sovalov","year":"1983","journal-title":"Regimes of the United Power System"},{"key":"ref33","author":"lee","year":"2003","journal-title":"Executive summary of virtual regional transmission organizations and the standard market design A conceptual development with illustrative examples"},{"key":"ref32","year":"0","journal-title":"Version 0 reliability standard"},{"key":"ref31","year":"0","journal-title":"Balance resources and demand standard"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1982.317378"},{"key":"ref37","author":"rabinovich","year":"1989","journal-title":"Automatic underfrequency unloading in power systems"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1109\/PESW.1999.747269"},{"key":"ref35","article-title":"a eulogy for rtosinterregional is better","volume":"138","author":"ilic","year":"2000","journal-title":"Public Utilities Fortnightly"},{"key":"ref34","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4471-3461-9","author":"ilic","year":"1996","journal-title":"Hierarchical Power Systems Control - Its Value in a Changing Industry"},{"key":"ref10","year":"0","journal-title":"Report on failure inquiry in UES of Russia took place on May 25 2005"},{"key":"ref40","year":"0","journal-title":"Reliability coordinator"},{"key":"ref11","author":"voropai","year":"1984","journal-title":"Control in large power interconnections"},{"key":"ref12","first-page":"629","article-title":"An advanced tool for analyzing multiple cascading failures","author":"hardiman","year":"2004","journal-title":"2004 International Conference on Probabilistic Methods Applied to Power Systems PMAPS"},{"key":"ref13","article-title":"how russia maintains a reliable power grid","author":"semenov","year":"1997","journal-title":"Transmission Distribution World"},{"key":"ref14","author":"sovalov","year":"1988","journal-title":"Emergency prevention control in power systems"},{"key":"ref15","year":"2003","journal-title":"Unified Energy System of Russia (UES) annual report"},{"key":"ref16","author":"diyakov","year":"0","journal-title":"United Power System and Russian competitive electricity market"},{"key":"ref17","year":"1981","journal-title":"General instructions and standards on power systems expansion planning"},{"key":"ref18","year":"1977","journal-title":"The rules of technical exploitation of electric power plants and networks"},{"key":"ref19","year":"1983","journal-title":"General instructions on stability of power systems"},{"key":"ref28","year":"2002","journal-title":"Description of area control error (ACE) calculation (automatic time error control)"},{"key":"ref4","year":"2003","journal-title":"Memorandum of the development and the reasons of the East Coast US blackout on August 14 2003"},{"key":"ref27","year":"2002","journal-title":"WECC procedure for time error control"},{"key":"ref3","year":"2004","journal-title":"Technical analysis of the August 14 2003 blackout What happened why and what did we learn?"},{"key":"ref6","year":"2003","journal-title":"Investigation report into the loss of supply incident affecting parts of south London at 18 20 on Thursday 28 August 2003"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1982.317377"},{"key":"ref5","article-title":"it was possible to avoid the blackout","author":"vakhterov","year":"2004","journal-title":"Markets for Power"},{"key":"ref8","year":"2003","journal-title":"Interim report of the investigation committee on the 28 September 2003 blackout in Italy"},{"key":"ref7","year":"2003","journal-title":"Power failure in eastern Denmark and southern Sweden on 23 September 2003 (final report)"},{"key":"ref2","year":"2004","journal-title":"Final Report on the August 14 2003 Blackout in the United States and Canada Causes and Recommendations"},{"key":"ref9","year":"2003","journal-title":"Black-out The events of 28 September 2003"},{"key":"ref1","year":"0","journal-title":"NERC Planning Standards"},{"key":"ref20","first-page":"120","article-title":"emergency control in the united power system of russia","volume":"51","author":"stroev","year":"2000","journal-title":"J Elect Eng"},{"key":"ref22","year":"0","journal-title":"Policy1Generation control and performance"},{"key":"ref21","year":"2000","journal-title":"The Changing Structure of the Electric Power Industry 2000 An Update"},{"key":"ref42","author":"gurevich","year":"1990","journal-title":"Design of stability and emergency control automatic devices in power systems"},{"key":"ref24","author":"jaleeli","year":"1997","journal-title":"Control performance standards for interconnected operation"},{"key":"ref41","author":"koscheev","year":"1990","journal-title":"Automatic emergency prevention control in electric power systems"},{"key":"ref23","year":"0","journal-title":"Policy1?Generation control and performance Performance standards reference document"},{"key":"ref26","year":"0","journal-title":"Time error monitor version 1 5"},{"key":"ref43","year":"0","journal-title":"EPRI Destinations 2005 Protection coordination and controlled system separation"},{"key":"ref25","year":"2003","journal-title":"WECC coordinated off-nominal frequency load shedding and restoration plan"}],"container-title":["Proceedings of the IEEE"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/5\/32521\/01519725.pdf?arnumber=1519725","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,11,29]],"date-time":"2021-11-29T20:22:49Z","timestamp":1638217369000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/1519725\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,11]]},"references-count":43,"journal-issue":{"issue":"11"},"URL":"https:\/\/doi.org\/10.1109\/jproc.2005.857486","relation":{},"ISSN":["0018-9219"],"issn-type":[{"value":"0018-9219","type":"print"}],"subject":[],"published":{"date-parts":[[2005,11]]}}}