{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,11]],"date-time":"2026-02-11T18:30:30Z","timestamp":1770834630367,"version":"3.50.1"},"reference-count":82,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,8]]},"DOI":"10.1109\/pscc.2014.7038504","type":"proceedings-article","created":{"date-parts":[[2015,2,17]],"date-time":"2015-02-17T20:01:50Z","timestamp":1424203310000},"page":"1-18","source":"Crossref","is-referenced-by-count":31,"title":["Advanced optimization methods for power systems"],"prefix":"10.1109","author":[{"given":"P.","family":"Panciatici","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.C.","family":"Campi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S.","family":"Garatti","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S.H.","family":"Low","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"D.K.","family":"Molzahn","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.X.","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"L.","family":"Wehenkel","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"79","doi-asserted-by":"publisher","DOI":"10.1109\/PSCC.2014.7038374"},{"key":"78","article-title":"Large margin classification with the progressive hedging algorithm","author":"defourny","year":"2009","journal-title":"Proc Second NIPS Workshop Optimization for Machine Learning"},{"key":"77","author":"lorca","year":"2014","journal-title":"Multistage Adaptive Robust Optimization for Electric Power Systems Operation"},{"key":"35","doi-asserted-by":"publisher","DOI":"10.1109\/PSCC.2014.7038397"},{"key":"36","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2014.2320819"},{"key":"33","doi-asserted-by":"publisher","DOI":"10.1109\/Allerton.2011.6120344"},{"key":"34","doi-asserted-by":"publisher","DOI":"10.1109\/HICSS.2014.293"},{"key":"39","doi-asserted-by":"publisher","DOI":"10.1137\/050623802"},{"key":"37","article-title":"Optimal power flow as a polynomial optimization problem","author":"ghaddar","year":"2014","journal-title":"IBM Research Ireland Tech Rep"},{"key":"38","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2274577"},{"key":"43","article-title":"Applications and algorithms for mixed integer non linear programming","author":"leyffer","year":"2009","journal-title":"SciDAC Journal of Physics"},{"key":"42","doi-asserted-by":"publisher","DOI":"10.1109\/59.932295"},{"key":"41","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2170772"},{"key":"40","author":"molzahn","year":"0","journal-title":"Sparsity-exploiting Moment-based Relaxations of the Optimal Power Flow Problem"},{"key":"82","doi-asserted-by":"publisher","DOI":"10.1017\/CBO9780511626371"},{"key":"80","article-title":"Emergency control and its strategies","author":"wehenkel","year":"1999","journal-title":"Proceedings of Power Systems Computational Conference (PSCC)"},{"key":"81","doi-asserted-by":"crossref","DOI":"10.1002\/9780470316511","author":"rubinstein","year":"1981","journal-title":"Simulation and the Monte-Carlo Method"},{"key":"67","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2010.2087367"},{"key":"66","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2013.09.028"},{"key":"69","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2244619"},{"key":"68","doi-asserted-by":"publisher","DOI":"10.1137\/080734510"},{"key":"22","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2160974"},{"key":"23","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2011.06.003"},{"key":"24","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2170772"},{"key":"25","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2258044"},{"key":"26","article-title":"Equivalent relaxations of optimal power flow","author":"bose","year":"2014","journal-title":"IEEE Trans Automatic Control"},{"key":"27","doi-asserted-by":"publisher","DOI":"10.1109\/TCNS.2014.2309732"},{"key":"28","doi-asserted-by":"publisher","DOI":"10.1109\/TCNS.2014.2323634"},{"key":"29","author":"bose","year":"2012","journal-title":"Quadratically Constrained Quadratic Programs on Acyclic Graphs with Application to Power Flow"},{"key":"3","year":"0","journal-title":"E-HighWay2050 Modular Development Plan of the Pan-European Transmission System 2050"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1109\/MSPEC.1978.6367813"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1287\/moor.16.1.119"},{"key":"7","year":"0"},{"key":"30","doi-asserted-by":"publisher","DOI":"10.1109\/Allerton.2013.6736636"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1109\/59.317577"},{"key":"5","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1016\/S0005-1098(98)00178-2","article-title":"Control of systems integrating logic, dynamics, and constraints","volume":"35","author":"bemborad","year":"1999","journal-title":"Automatica"},{"key":"32","doi-asserted-by":"publisher","DOI":"10.1109\/Allerton.2012.6483274"},{"key":"4","year":"0","journal-title":"GARPUR Generally Accepted Reliability Principle with Uncertainty Modelling and Through Probabilistic Risk Assessment"},{"key":"31","article-title":"Convex Relaxation for optimal Power Flow Problem: Mesh Networks","author":"madani","year":"2014","journal-title":"IEEE Trans on Power Syst"},{"key":"70","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2250530"},{"key":"71","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2251916"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/MSP.2010.936019"},{"key":"72","article-title":"Robust optimization and its application to power system operation","author":"zheng","year":"2012","journal-title":"CIGRE"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1109\/PSCC.2014.7038373"},{"key":"73","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2275013"},{"key":"74","article-title":"Adaptive robust optimization and dynamic uncertainty sets for multi-period economic dispatch with significant wind","author":"lorca","year":"2014","journal-title":"IEEE Trans on Power Syst"},{"key":"75","article-title":"Exploring the modeling capacity of two-stage robust optimization: Variants of robust unit commitment model","author":"an","year":"2014","journal-title":"IEEE Trans on Power Syst"},{"key":"76","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2288017"},{"key":"59","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2013.6652374"},{"key":"58","doi-asserted-by":"publisher","DOI":"10.1109\/IREP.2013.6629408"},{"key":"57","article-title":"Probabilistic guarantees for the N-1 security of systems with wind power generation","author":"vrakopoulou","year":"2012","journal-title":"Proc PMAPS"},{"key":"56","article-title":"The value of using chanceconstrained optimal power flows for generation re-dispatch under uncertainty with detailed security constraints","author":"hamon","year":"2013","journal-title":"Proceedings of the 5th IEEE PES Asia-Pacific Power and Energy Engineering Conference"},{"key":"19","doi-asserted-by":"publisher","DOI":"10.1109\/SmartGridComm.2011.6102366"},{"key":"55","article-title":"Dayahead security assessment under uncertainty relying on the combination of preventive and corrective controls to face worst-case scenarios","author":"capitanescu","year":"2011","journal-title":"Proceedings of PSCC"},{"key":"17","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.879234"},{"key":"18","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1016\/j.ijepes.2007.12.003","article-title":"Semidefinite programming for optimal power flow problems","volume":"30","author":"bai","year":"2008","journal-title":"Int'l J of Electrical Power & Energy Systems"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2288009"},{"key":"16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2010.2051168"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1137\/S1052623400366802"},{"key":"14","volume":"1","author":"lasserre","year":"2010","journal-title":"Moments Positive Polynomials and Their Applications"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1017\/CBO9780511804441"},{"key":"12","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-4381-7","volume":"27","author":"wolkowicz","year":"2000","journal-title":"Handbook of Semidefinite Programming Theory Algorithms and Applications"},{"key":"21","doi-asserted-by":"publisher","DOI":"10.1109\/61.19265"},{"key":"20","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2255318"},{"key":"64","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2012.2205021"},{"key":"65","doi-asserted-by":"publisher","DOI":"10.1016\/j.orl.2013.05.003"},{"key":"62","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2169817"},{"key":"63","first-page":"1","article-title":"Robust unit commitment problem with demand response and wind energy","author":"zhao","year":"2012","journal-title":"Power and Energy Society General Meeting"},{"key":"60","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2251015"},{"key":"61","doi-asserted-by":"publisher","DOI":"10.1007\/s10898-009-9479-y"},{"key":"49","doi-asserted-by":"publisher","DOI":"10.1109\/TAC.2006.875041"},{"key":"48","doi-asserted-by":"publisher","DOI":"10.1007\/s10107-003-0499-y"},{"key":"45","author":"anitescu","year":"2000","journal-title":"On Solving Mathematical Programs with Complementarity Constraints As Nonlinear Programs"},{"key":"44","article-title":"Mixed integer nonlinear programming (MINLP)","author":"leyffer","year":"2005","journal-title":"INFORMS Annual Meeting"},{"key":"47","article-title":"A progressive method to solve large-scale AC Optimal Power Flow with discrete aspects and control of the feasibility","author":"ruiz","year":"2014","journal-title":"Proceedings of PSCC"},{"key":"46","article-title":"Development of prototype software for steady state optimization of the ETN","author":"platbrood","year":"2011","journal-title":"Tech Rep PEGASE Consortium"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/MSP.2013.2245726"},{"key":"51","doi-asserted-by":"publisher","DOI":"10.1016\/j.arcontrol.2009.07.001"},{"key":"52","doi-asserted-by":"publisher","DOI":"10.1007\/s10957-010-9754-6"},{"key":"53","doi-asserted-by":"publisher","DOI":"10.1109\/MCS.2012.2234964"},{"key":"54","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2011.04.003"},{"key":"50","doi-asserted-by":"publisher","DOI":"10.1137\/07069821X"}],"event":{"name":"2014 Power Systems Computation Conference (PSCC)","location":"Wroc\u0142aw, Poland","start":{"date-parts":[[2014,8,18]]},"end":{"date-parts":[[2014,8,22]]}},"container-title":["2014 Power Systems Computation Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7012181\/7038098\/07038504.pdf?arnumber=7038504","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,23]],"date-time":"2017-06-23T05:44:56Z","timestamp":1498196696000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7038504\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,8]]},"references-count":82,"URL":"https:\/\/doi.org\/10.1109\/pscc.2014.7038504","relation":{},"subject":[],"published":{"date-parts":[[2014,8]]}}}