{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,21]],"date-time":"2026-02-21T12:49:35Z","timestamp":1771678175366,"version":"3.50.1"},"reference-count":17,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,6]]},"DOI":"10.1109\/pscc.2016.7541015","type":"proceedings-article","created":{"date-parts":[[2016,8,15]],"date-time":"2016-08-15T22:52:43Z","timestamp":1471301563000},"page":"1-7","source":"Crossref","is-referenced-by-count":2,"title":["Incorporating multi-area reliability concepts to the evaluation of the Brazilian power system capacity to supply the peak load"],"prefix":"10.1109","author":[{"given":"T.C.","family":"Justino","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"L.G.B.","family":"Marzano","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"A.C.G.","family":"Melo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.E.P.","family":"Maceira","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"F.R.S.","family":"Batista","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","author":"endrenyi","year":"1978","journal-title":"Reliability Modeling in Electric Power Systems"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-7731-7"},{"key":"ref12","article-title":"A Frequency and Duration Method for Reliability Evaluation of Large Scale Hydrothermal Generating Systems","author":"silva","year":"0","journal-title":"1991 IEE Proceedings Pt C"},{"key":"ref13","article-title":"Improved Algorithms for Multi-Area Reliability Evaluation Using the Decomposition \/ Simulation Approach","author":"singh","year":"0","journal-title":"paper No 88 SM 691-8 1988 IEEE Summer Power Meeting"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TR.1983.5221681"},{"key":"ref15","article-title":"Probabilistic Criteria Establishment of Electricity Supply and Its Application","year":"1984","journal-title":"Coordinator Group for System Expansion \/ Coordinator Group for Interconnected Operation"},{"key":"ref16","article-title":"Final Technical Report of Aspects to Modeling of National Interconnected System in the CONFINT Model Applications","author":"porto","year":"2005","journal-title":"Tech Rep elaborated for the National Electric System Operator (ONS)"},{"key":"ref17","article-title":"Ten-Year Energy Expansion Plan 2023","year":"2014","journal-title":"Ministry of Mines and Energy (MME) \/Energy Research Office (EPE)"},{"key":"ref4","article-title":"Ten Years of Application of Stochastic Dual Dynamic Programming in Official and Agent Studies in Brazil - Description of the NEWAVE Program","author":"maceira","year":"0","journal-title":"Proc Power Syst Comput Conf 2008"},{"key":"ref3","article-title":"Chain of Optimization Models for Setting the Energy Dispatch and Spot Price in the Brazilian System","author":"maceira","year":"0","journal-title":"Proc 2002 Power Systems Computation Conference"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2012.04.016"},{"key":"ref5","article-title":"Analytically Based Frequency and Duration Calculations for Multi-Area Reliability Evaluation","author":"melo","year":"0","journal-title":"Proc 1993 Power Systems Computation Conference"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.1987.4335280"},{"key":"ref7","author":"ford","year":"1962","journal-title":"Flows in Networks"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/PSCC.2014.7038321"},{"key":"ref1","article-title":"Ten-Year Energy Expansion Plan 2020","year":"2011","journal-title":"Ministry of Mines and Energy (MME) \/Energy Research Office (EPE)"},{"key":"ref9","article-title":"Multi-Area Reliability Evaluation","volume":"pwrs 2","author":"lee","year":"1987","journal-title":"IEEE Transactions on Power Systems"}],"event":{"name":"2016 Power Systems Computation Conference (PSCC)","location":"Genoa, Italy","start":{"date-parts":[[2016,6,20]]},"end":{"date-parts":[[2016,6,24]]}},"container-title":["2016 Power Systems Computation Conference (PSCC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7527554\/7540812\/07541015.pdf?arnumber=7541015","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2016,9,29]],"date-time":"2016-09-29T22:39:37Z","timestamp":1475188777000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7541015\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,6]]},"references-count":17,"URL":"https:\/\/doi.org\/10.1109\/pscc.2016.7541015","relation":{},"subject":[],"published":{"date-parts":[[2016,6]]}}}